Timetraveller
Member
As reported on BBC South today (evening) and website link provided below.
Emergency works required with 20mph speed restriction in place reducing number of trains between Friday 8th and 10th December. Planned engineering was due to shut the line on Sunday only.
Advice only to travel if essential. Down to 2 tracks instead of 4.
www.bbc.co.uk
Emergency works required with 20mph speed restriction in place reducing number of trains between Friday 8th and 10th December. Planned engineering was due to shut the line on Sunday only.
Advice only to travel if essential. Down to 2 tracks instead of 4.
South Western Railway disruption due to urgent landslip works
Cracks up to 45m long and a metre deep have been found in a slope next to a train track.