I have a First Advance for next Saturday from St Ives to Guildford changing at Reading.
NRE is now showing (which it didn't when I booked the ticket) that there are emergency engineering works in the Reading area that day and there is a replacement bus operating Theale to Reading.
I've a couple of questions:
1. If I'm delayed over an hour based on the original timing of the journey can I claim delay replay?
2. Using my ticket do I have the option to change at Exeter for the SWR service and change at Woking as this is what I would have booked if I'd known there would be a RRB (I will have heavy luggage). GWR don't yet have the engineering works or advice on their website.
Thanks for any advice
NRE is now showing (which it didn't when I booked the ticket) that there are emergency engineering works in the Reading area that day and there is a replacement bus operating Theale to Reading.
I've a couple of questions:
1. If I'm delayed over an hour based on the original timing of the journey can I claim delay replay?
2. Using my ticket do I have the option to change at Exeter for the SWR service and change at Woking as this is what I would have booked if I'd known there would be a RRB (I will have heavy luggage). GWR don't yet have the engineering works or advice on their website.
Thanks for any advice
