Agreed. The IEP project originally started out as "HST2", a straight replacement for the time served HST. As such, I expected a similar level of development and consideration put into the development of these trains as was the case with the HSTs (Arranging the first class seating bays so that they matched the length of the windows, etc), but all such considerations seem to have gone out of the window. IEP is trying to be too many things to too many people, a jack of all trades but a master of none.
--- old post above --- --- new post below ---
That seems to be an excessive amount of stock procurement for the ECML, and why would you specify 160mph capable stock? Without in-cab signalling, even 140mph is beyond the scope of Intercity operation,and by raising the line speed you reduce the number of paths available for freight and local trains and increase the number of conflicts with these services on what is a predominantly twin track railway.
Ideally, electrification of the MML, if only it was going to happen anytime soon, would release 222s for use on the ECML (Mainly the seven car units, but a few five car trains would be required as well) as bi-mode trains with pantograph cars, and electrification of the Transpennine routes would see Leeds-York and Hull electrified. With Scotlands' current pro-active approach to electrification, I wouldn't be surprised if Aberdeen is electrified by the time the 225 come up for replacement as well.
I think the ECML could get by with the six 7-car and four former Hull Trains 4-car 222s (With pantograph cars that'd provide six 9-car trains and four 5/6-car units, with the long sets on the Scottish runs and the shorter ones on the shorter distance English flows) even without those electrification projects if only a couple of additional electric trains sets could be procured (90s and mark 3s, or whatever), leaving seventeen 7-car bi-mode sets for the GWML or XC.
And then if/when those sections of electrification are completed, then order a fleet of forty 140mph capable (While I have outlined the problems of 140mph running above, I think that the installation of in-cab signalling to allow higher speed running over sections of the ECML would be a realistic aspiration within the course of the trains 30-40 year life spans) electric sets to replace the 225s. Sorted.