All Chiltern would need are conventional dual voltage EMU's - they'd use OHLE on the existing non-electrified sections, and on the Met they'd operate in the same way as 3rd rail units do over sections of the Richmond and Wimbledon branches.
Like i said, it might not be as exciting as taking over sections of the Met or S Stock to Aylesbury but there's really no need for such radical solutions which have numerous drawbacks.
Chris
It's not quite as simple as that. Do they drop their pantographs at Harrow, run on d.c. to Amersham, then put them up again (which requires the least changes, but has them at lower than normal power for a long, fast section) or Moor Park to Amersham (which optimises power use, but means pulling up miles of conductor rail and the Met losing the use of the fasts)?