Reading this,
Dare I say;
We have plenty of 508s and a few 313s
Dare I say;
We have plenty of 508s and a few 313s
I often wonder if the sensible approach for branch line electrification would be to use lower voltages than 25kV. Light weight EMUs would need less power, and lower voltages would mean lower clearances from structures..
Would it be cheaper to convert the Cardiff Valley lines to a Manchester or Tyneside -style tramway, retaining provision for any occasional freight services that might still be running ? Most of the Valley line passenger services are self-contained and need not conflict with any 25 kV electric lines at Cardiff.
If ever electrified, only Maesteg & Ebbw Vale lines would be 25 kV, and initially use cascaded emu's from elsewhere.
Bevan
Over 30 miles I think if the figure of £3.5m per mile of electrification I have is correct (I think it may have been you who provided it).WAG announced today that it was to fund (with Convergence money) a 3 mile dual carriageway link road from Port Talbot Docks to the M4. At £107 million or £35 million a mile.
How many route miles could be electrified for that?
How long are 150s? I assuming they can't be much shorter than a 2-car class 377 Electrostar would be and that the platforms lengthened to take 6 cars would have been done to take 6-car 150s not just 6-car pacers. Maybe a 6-car Electrostar would therefore fit in those legthened platforms, if not maybe with a mix of 2 and 3 car Electrostars they could run trains as 5-car formations which perhaps would fit....but could all stations cope with a six car EMU? (a three car EMU will be the size of two Pacers, given the short 15m coaches)
The "Greater Cardiff" area, are you including Swansea in that? There are some similar valleys radiating from Swansea, however unlike Cardiff their railways have all been lifited or reduced to freight-only. In the north a very different project is needed, a Metro type thing is inappropriate, but the electrification of the North Wales Coast Line to Holyhead, Llandudno, Almwch (currently mothballed) and Caernarfon (currently lifted) would be appropriate, but not till after Valleys electrification and alongside Wrexham Central - Mersyrail. Another project for the north is to reopen Mold to Denbigh and Rhyl to Bala via Denbigh and Corwen (as these are linked to Wrexham Central and the North Wales Coast I thin I could be worth electrifing these from the outset.) I'm getting very long term now though, we need very many years of transport budgets to cover that lot.The "Greater Cardiff" area can justify an electrified "Metro" service. The rest of Wales can't. Sadly the politicians will want some kind of equivalent investment elsewhere, which would push up the costs of Valley Electrification (since you'll need to be seen to be spending money in Gwynedd etc too, even if it's not justified)
No thanks, for the same reason as 150s, the doors are in the wrong place. Has to be 158s for the Fishguard district line expresses, I think there might be enough for the Cambrian to go hourly anyway.good idea although i would displace the class 158's saved from the Maesteg - Cheltenham service to work the cambrain line services. as for the Fishgaurd - cardiff express service you could look to see if if any class 165/166 units would be available.......
I'd have stations on the District Line (Morriston and Pontlliw, and possibly a Llansamlet Low Level in the tunnel beneath the Swanline station with a lift up but that's probablly impossible to build), but not stop the west Wales expresses there. Instead the aforementioned Swansea valley lines network (which would radiate from Swansea docks) would serve them.If a service is run on the Swansea disctrit line then new stations should be opened at Morriston ( near to the Swansea metro FTR route enabling links to Morriston Hospital etc) & at Llandacry which should take some traffic off the M4
The "Greater Cardiff" area, are you including Swansea in that? There are some similar valleys radiating from Swansea, however unlike Cardiff their railways have all been lifited or reduced to freight-only
The point I was making is that the "Valley Lines" can be run as a self contained "metro" system. For the purposes of this I'm not talking the GWML/ Maesteg/ Ebbw Vale/ Newport/ Swansea.
Electrifying routes make a lot more sense when its on a self contained set of "frequent" services, otherwise you get diesels running under the wires for long stretches (spoiling the cost/benefit ratio) or end up having links chopped.
For that reason, electrifying the Valleys makes a lot more sense than doing the GWML. Also, EMUs should be able to cope with the gradients easier than Pacers/ 150s.
I know the consensus seems to be "wire the GWML, then do the Valleys afterwards". The point I was trying to make is that the Valleys should be done first (regardless of whether the Severn Tunnel is ever wired)
I agree that the Valley lines should be electrified ahead of the Great Western main line. The self-contained core network should be electrified first, as it means that all trains running under the wires will be electric, and offers increased passenger capacity whilst replacing the Pacers. Id then say that Ebbw Vale to Maesteg should be electrified, as once that is done it increases the case for electrifying the South Wales main line in addition to the GWML, as there would only be two comparatively small infill schemes between Filton Junction-Ebbw Junction (Newport) and Bridgend-Swansea to be completed in order to link Cardiff and Swansea into the GWML Bristol electrification.
Even without an extension of GWML electrification into Wales, the self-contained Valley lines network already has a stand alone justification of its' own for electrification of all the local services.
I agree with all of that. I'd see Ebbw Vale to Maesteg as "stage two", possibly with an increased order for EMUs for the "stage one" electrification (loadings should increase for a three coach EMU compared to the half-sized Pacers that run some duties)
If they are clever they can do it in self-contained stages, with each completed part enhancing the business case for the next one (in the way that wiring Manchester - Bolton - Preston - Blackpool will improve the cost/benefit ratio of wiring Bolton - Wigan - Southport/Kirkby).
Do one thing well, let people see that it works, create a "we want it too" demand from the other areas, extend it piece by piece...