As per subject title, how much work and what exactly needs to be done to upgrade from a 1.5kV DC OHL system to the UK standard 25kV AC OHL System?
The reason I was wondering about this is simply because in the Dublin area, Iarnród Éireann who operate the Dublin Area Rapid Transit system has plans to electrify the Western Commuter line from Dublin Connolly to Maynooth as a extension of the network.
However I believe they have already stated that future electrification on the Irish network is planned to be at 25kV AC power, while the existing DART network will remain at 1.5kV DC.
Which brings me to Bi Modes, is it cheaper to electrify at 25kV AC power including DART Metals, keep the existing DART network at 1.5kV DC and use Bi Modes which can work off either system OR
electrify the Irish Network at 25kV AC power and upgrade the existing DART network to use this instead of the existing 1.5kV DC?
The reason I was wondering about this is simply because in the Dublin area, Iarnród Éireann who operate the Dublin Area Rapid Transit system has plans to electrify the Western Commuter line from Dublin Connolly to Maynooth as a extension of the network.
However I believe they have already stated that future electrification on the Irish network is planned to be at 25kV AC power, while the existing DART network will remain at 1.5kV DC.
Which brings me to Bi Modes, is it cheaper to electrify at 25kV AC power including DART Metals, keep the existing DART network at 1.5kV DC and use Bi Modes which can work off either system OR
electrify the Irish Network at 25kV AC power and upgrade the existing DART network to use this instead of the existing 1.5kV DC?