Electrification Voltage Types

Status
Not open for further replies.

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Couldn't think of a different title - sorry!

I was reading up that the old Bury-Man Vic BR line (now the Metrolink) had a different AC electrification type than elsewhere on the network (can someone confirm that for me?)

After reading that, I was wondering, within the two chief electrification types (AC overheads and DC third), how many different voltages are there, and where are they used?

I know the WCML is 25,000V and third rail is 750V, and that West Yorkshire must have different powers in the overheads, as a 225 would drain all the power from the area when running over it -hence Skipton-Kings Cross trains being HSTs!

Thanks in advance, guys!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
1200v DC side contact 3rd rail.
Here you go, a 1983 photo of a class 504 on the Bury line.

Class_504_approaches_Bury_Interchange_station.jpg


Couple of other light rail electrifications you can add, Blackpools 600v DC overhead, All the other tram networks are 750v DC OHLE, Tyne and Wear Metro is 1500v DC OHLE
 
Last edited:

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Thanks for the info and photo.

Are all mainline using OHLE (ECML, WCML etc) 25,000V and are areas like northern Thameslink, Hitchin-Kings Lynn etc weaker versions of these?

Also, what power will the Northern electrification be?
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
I know the WCML is 25,000V and third rail is 750V, and that West Yorkshire must have different powers in the overheads, as a 225 would drain all the power from the area when running over it -hence Skipton-Kings Cross trains being HSTs!
The ECML is 25kV also, that is the only overhead anywhere in the UK railway network. Don't forget that Class 92s have far more draw than a 91 as well, and are predominantly WCML machines.
 

First class

Established Member
Joined
9 Aug 2008
Messages
2,731
Merseyrail has a mixture of 650v and 750v DC.

Isn't the tyne metro overhead DC?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
The SR third rail system is nominally 750V DC, but around that figure there are fairly large variations. For example, one of Network Rail's current projects in south London is to completely separate supplies to LU and NR, because a few odd bits of SW London are running at 660V for LU's benefit. Stuff like the District shared sections to Richmond and Wimbledon, and the whole Waterloo & City line, which although functionally separate still uses SR power.

(Probably something similar on the DC lines as well.)

Once all the south London systems are completely separate, I think the intention is to wind the NR side up to a higher working voltage, maybe 800V?, but it'll still be referred to as a 750V system as far as I can see...
 
Last edited:

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
All mainline OHLE is 25kv yes, issues arise as some units draw more power than others and some areas may have a large amount of traffic the area needs sufficent transformer capacity to keep up with demand or you will either have sections of undervoltage or overtaxed transformers may burn out faster than normal.
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
Some of us tried to answer an almost identical question on here last week:
http://www.railforums.co.uk/showthread.php?t=37829.
There might be some more useful help there.
--- old post above --- --- new post below ---
. . . . West Yorkshire must have different powers in the overheads, as a 225 would drain all the power from the area when running over it -hence Skipton-Kings Cross trains being HSTs!
I wonder if you may be confusing the available current from the distribution network and the line-side transformers with the choice of voltage and pick-up system.

"Draining power" would indicate a lack of available current (which in turn is likely to lead to a voltage drop). This can arise in systems of any voltage when the demand exceeds the designed capacity.
 

TGV

Member
Joined
25 Nov 2005
Messages
734
Location
320km/h Voie Libre
There's also the AC supply to HS1 which is autotransformer 25kV - which is a 50kV supply with effectively a "centre tapping" to give 2 wires - (the contact wire and the return wire which is the one you can see on HS1 that's on the non-rail side of the OLE masts held with insulators) at 25kV but in opposite phases, with the rail being the "0" or earth.

I mean, it's still 25kV as far as the train is concerned, but from an infrastructure point of view, it's very different (and damn clever).
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
I was just reading about that (through a link from the second article I posted)- apparently there's some of that installed on the WCML too. Makes no difference to the rolling stock, as you say- it's about extending range and even making the power supply more resilient/smoother etc.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
It was my understanding all the 25kv would be naturally replaced with autotransformer, cheaper to maintain.
 

Lampshade

Established Member
Joined
3 Sep 2009
Messages
3,777
Location
South London
I know the WCML is 25,000V and third rail is 750V, and that West Yorkshire must have different powers in the overheads, as a 225 would drain all the power from the area when running over it -hence Skipton-Kings Cross trains being HSTs!

Thanks in advance, guys!

It's still 25kV, the Skipton Line doesn't have its own supply so the current there isn't sufficent to power a Mk4 set.
 
Last edited by a moderator:

Hydro

Established Member
Joined
5 Mar 2007
Messages
2,204
A lot of the 750v DC infrastructure on the SWML was upgraded when the Desiros were introduced, and apparently is more on the side of 850v now.
 