Are there any plans to increase these (EPS) speeds, given that plans are for most London Glasgows to be first stop Preston?
How much would actually be saved?
Do Virgin WC still have designs on reducing Glasgow journey times?
Well the current 1630 ex Euston is timed at 2 hours to Preston, saving around 11 minutes over services that stop at Warrington and Wigan.
Well the current 1630 ex Euston is timed at 2 hours to Preston, saving around 11 minutes over services that stop at Warrington and Wigan.
Yes but the line speeds remain the same.
Will Watford go up to 125? Good luck increasing any stopping there! It's currently 80-90?
.
So the 30 min journey reduction I saw for Hull to London is pie in the sky then?
So the 30 min journey reduction I saw for Hull to London is pie in the sky then?
I don't agree with your assumption of £6 million per double track mile electrification cost. GWML electrification was authorised on the basis that single track mile electrification would be no more than £750k using the factory trains.
The Harrogate Loop has recently been costed at £93 million for 65 single track miles but with four tunnels one of which is over two miles long, four substantial viaducts and 19 overbridges between Leeds and Harrogate alone, the civils part is greater than the average 45% of costs. One feeder station and one section cabin have been included in case the feeder stations at Kirkstall and Poppleton have insufficient capacity.
Will Watford go up to 125? Good luck increasing any stopping there! It's currently 80-90?
I'm surprised that Bradford Interchange to Leeds isn't listed as a potential project under consideration; it strikes me as the sort of low hanging infill scheme that'd make sense for freeing up DMUs etc. With Leeds to York and Selby electrification confirmed it'd allow Northern to run electric Bradford Interchange to Selby/York stoppers and cut the diesel services back to Bradford
I'm surprised that Bradford Interchange to Leeds isn't listed as a potential project under consideration; it strikes me as the sort of low hanging infill scheme that'd make sense for freeing up DMUs etc. With Leeds to York and Selby electrification confirmed it'd allow Northern to run electric Bradford Interchange to Selby/York stoppers and cut the diesel services back to Bradford
I certainly can't see many votes in telling people from Halifax/ Hebden Bridge etc that they are losing their direct service to Leeds.
I'm surprised that Bradford Interchange to Leeds isn't listed as a potential project under consideration; it strikes me as the sort of low hanging infill scheme that'd make sense for freeing up DMUs etc. With Leeds to York and Selby electrification confirmed it'd allow Northern to run electric Bradford Interchange to Selby/York stoppers and cut the diesel services back to Bradford
No real point if you aren't going to wire through to Rochdale and Manchester Victoria (since nothing terminates at Bradford Interchange - apart from the magical mystery tour GC services that go nowhere near Leeds).
I certainly can't see many votes in telling people from Halifax/ Hebden Bridge etc that they are losing their direct service to Leeds.
But surely the Hebden Bridge rail travellers will still be served by the Blackpool North to York services to give them direct services to Leeds.

Calder Valley line in general will actually come later than anyone on here would wish. It is simply too complex to wire, from an engineering point of view.
Calder Valley line in general will actually come later than anyone on here would wish. It is simply too complex to wire, from an engineering point of view.
No, it is 110mph now (not including the TSR) and stays 110mph after.
We basically already knew that. Network Rail say that the existing slate of electrification projects will take them well beyond the end of CP5 (2014-2019), so anything additional has got to be well into CP6.