• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Electrification the DFT needs to get on with

Status
Not open for further replies.

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,792
Location
The White Rose County
Here is a map of my proposal for UK railway electrification. I've also enabled editing so that if I missed out any railway you are welcome to add :)

That's a fascinating map!

Its great to see crayon being put to paper! ;)

Here's my list although it only really covers the MML, Lancashire, Yorkshire!

 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,798
Location
South Yorkshire
Already so many comments so I thought I should post this before I spent the rest of the night reading them. Only the other night I was thinking about this but more precisely what order then I realised the best way to visualize this is to get my crayons out and draw a map. So here it is...


Kettering to Sheffield since its the third mainline and would be politically silly to do anything else before it! Also part of it is needed for HS2. Then I would carry it on from Sheffield to Leeds via Barnsley and Wakefield Kirkgate. It is city to city and Barnsley and Wakefield are both heavily deprived areas! At the same time I would wire Horbury to Ravensthorpe so that it could connect onto Huddersfield once the TRU section has been completed and from Normanton to Church Fenton that should be wired by this point. After that I would continue it through Leeds to Harrogate. Its a busy line that could be integrated with the Shipley triangle services.

Then I would do Sheffield to Doncaster, Doncaster to Gilberdyke via Goole. Before Selby from the East side of the Swing bridge to Hull. This way any temporary closures and services could terminate at Selby, also this gives some time to work out how best to wire the Swing Bridge that is a bit of a sticking point. Then Leeds to Selby followed by Bradley Jct to Todmorden. By this point I would have wired in Lancashire...

Manchester Victoria to Rochdale, put a few more platforms in at Rochdale to free up platform space at Victoria, Blackpool South - Wesham, its single line running through heavily built up areas for about 20km, then I would do Preston - Colne, some big populations and not a single tunnel I believe. At the same time Bolton to Blackburn, since Bolton is already wired. Before the Burnley to Rochdale via Todmorden.

Back to Yorkshire I would then carry the wires on from Milner Royd Jct near Sowerby Bridge to Leeds via Bradford Interchange!

Ive tried to do it in a way that delivers the most economic benefit, but also in a way that naturally follows one another. Also by the ones that are easier to do with the least amount of disruption hence why Halifax is near the end.
Surely if you've done the MML to Sheffield and Sheffield to Doncaster, Swinton to South Kirkby Jn (just over 8 miles) would be an obvious extension. Would enable XC services to be all electric from Derby to Edinburgh/Glasgow.
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
Surely if you've done the MML to Sheffield and Sheffield to Doncaster, Swinton to South Kirkby Jn (just over 8 miles) would be an obvious extension. Would enable XC services to be all electric from Derby to Edinburgh/Glasgow.
Then you might as well do to B’ham, and you’ve got a possible service, especially if they did Bromsgrove to Bristol wiring
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,792
Location
The White Rose County
Then you might as well do to B’ham, and you’ve got a possible service, especially if they did Bromsgrove to Bristol wiring

My rational was generally based on

1) Politics
2) City to Centre or high commuter flows to towns
3) Ease of construction

I might have missed some routes off, whilst trying to keep it down to 10 routes in the East and 10 routes in the West.
 
Status
Not open for further replies.

Top