HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,283
I like the idea, but one issue with the 319s is that they are four coach units, whereas the Merseyrail EMUs (507/508s) are three coach (and therefore able to run in six coach formation, to get the most out of the Merseyside platforms).
A single 319 would be too short for rush hour services through Liverpool, but an eight coach 319 would be too long for the platforms.
Take the best of the trailers for the current Cl507/508 TSOs and use them to make up a few of the Cl319s into six carriage sets?
Sort of Tadpole-unit style.