It's my impression that today's WCML OHLE is significantly more complex than when it was first installed (a lot more components).
The high-level AT wire support adds significant intrusion.
You are right. I had not thought about that. The AT wire above each track plus SPS and largish insulators all add to complexity and visual intrusion. Mainly happened under WCRM work in the 2000s iirc

It's my impression that today's WCML OHLE is significantly more complex than when it was first installed (a lot more components)
Not sure where you mean, the ex Mark 1 areas are significantly simpler with the removal of auxiliary catenary under the route modernisation. Catenary supports are simpler with the removal of pulleys and replacement with cantilevers.
Just wondered why newer BR style overhead cantilever arms - which incidentally - look like a purchased Italian design (see attached photo) - do not use similar Italian lattice style masts - as they are visually far less intrusive than the very steel heavy masts we are using?
Yes, but new UKMS has an aerial earth wire and often an AF wire, so that works the other way?
Clear as mud![]()
I thought they looked Italian, but only when i saw the newer Italian designs did it click they might be one and the same, with a slight modification for 25KV.The Italian OLE would indeed look the same as Series 2, as the Bonomi cantilever is an Italian design originally used on 3kV equipment.
As alluded to above, painting solid masts would be a lot simpler and faster, spraying perhaps.I suspect it is cheaper, quicker and easier to make, deliver, erect and maintain the solid masts.