We don't actually know where on the electrified network the 5-car IEPs will be used, but the numbers of 5-car and 9-car ordered are based on a draft timetable DfT has drawn up. This DfT draft timetable shows 31 trains per day (in each direction) between PAD and CDF. About a third of those, including the service into Cardiff from Carmarthen/Swansea at 08:11, are shown as 5-car units. In the westbound direction, three trains in a row from Paddington to Cardiff/Swansea are shown as 5-car twice a day, with another two in a row later in the day. Assuming the same number of services run today, with IC125s with 546 seats, I make it over 1,000 fewer seats per day.
If that is the case, then surely the DfT have got it wrong - just like they did by thinking that 2 coach 158's would do linking the important cities of Cardiff >Bristol>Southampton & Portsmouth as well as the 4 & 5 coach Voyager fiasco. A 5 coach Hitachi running from Carmarthen into Cardiff at peak commuting time (8.11) will also be a huge mistake. We will then end up with a situation like we have today with Cross Country - where fares are raised due to the lack of seats available.
The Swansea services are shown as non-stop Newport to Reading, but the PAD-CDF workings also call at Bristol Parkway, Swindon and Didcot.
Surely, it would be more beneficial for those west of Cardiff if the Swansea trains stopped at Bristol Parkway to thus enable a change to services heading to the Midlands & north-east? In the case of Cardiff > Paddington trains, the stop at Bristol Parkway would not be so important as Cardiff (& Newport) already have direct services to Cheltenham, Birmingham, Derby & Nottingham? If they plan to not have the Swansea > PAD trains stopping at BPW, then the Cardiff > Nottingham trains will need much more capacity.
Should new direct electric services run from Bristol() (via Bath) to Oxford > Bedford, then surely, this negates the need to have south Wales trains stopping at Didcot as passengers could change at Swindon?
It seems to me that the DfT have cooked up plans and stock allocations without any consultation with the public. They think they know best but as has happened in the past, they have been widely inaccurate with their assessments. (The same goes for motorways).