HVDC links are between 100 kV to 800 kV with the current UK links ranging from 200 kV to 600 kV.
The Chinese have a 1,100 kV UHVDC link stretching 2,046 miles to transfer 12 GW.
Thank you for the reply.
Yes, one of the 4 units in Cruachan pumped hydro scheme is now contracted as inertia rather than generation. So rather than providing power, the turbine is powered to 600rpm.
Thank you, interesting.
Is that possibly because of the large amount of renewable energy sites in the Highlands and offshore, and lack of other revolving generators makes it necessary?