Electric trains using unelectrified track

RailwayRookie

Member
Joined
28 Jul 2023
Messages
268
Location
Norfolk
Is it in the Rule Book? If it isnt, then it isn't allowed.
Unless its in G1... "if there is a need to adopt an alternative rule or arrangement to the ones set out in the rule book..." and various considerations thereafter.

The absence of a rule allowing something doesnt automatically make it forbidden, but its a VERY grey area in practice
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Rescars

Established Member
Joined
25 May 2021
Messages
2,517
Location
Surrey
Does anyone know how far a Class 71 could travel on motor generator flywheel booster power alone?
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,520
Location
2 miles and 50 years away from the Longmoor Milita
Does anyone know how far a Class 71 could travel on motor generator flywheel booster power alone?
This linked thread, whilst nominally about the locos in class 74 form, has relevance: some of its posts touch on booster / flywheel arrangement (is similar to both 71 and 74). I can't recall the post #s but I hope it helps.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,806
Wasn't there some emergency coasting on one of the windy section of the ECML somewhere possibly around Newark or Grantham or near the border pretty recently after the wires were brought down?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,307
Location
Somerset
The only reference in the Rule Book is coasting under defective OLE, and is not a normal operating procedure on unelectrified track.
Presumably because in this country there has never been the need for such a rule.
 

TransportHub

Member
Joined
20 May 2015
Messages
176
Location
London
I thought he was talking about sections where the driver has to lower the pantographs, coast through while reconfiguring the train and then raise the pantographs again..? Apologies if I misunderstood
There's definitely one of those right next to Westenhanger station, I noticed looking back at my footage from there, a 373 panning back up

 

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,391
Location
Essex
There's definitely one of those right next to Westenhanger station, I noticed looking back at my footage from there, a 373 panning back up

Yeah that's what I was thinking of, it's still called a Voltage Change by Eurostar even though the actual voltage on both sides is still 25kv :lol:
 

Cach17

Member
Joined
13 Jul 2023
Messages
196
Location
Kent
On this topic, the track over the lifting section of the Kingsferry Bridge on the Sheerness branch is devoid of third rail, meaning trains have to coast across it.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
I thought he was talking about sections where the driver has to lower the pantographs, coast through while reconfiguring the train and then raise the pantographs again..? Apologies if I misunderstood

Yes, but unless I’m horribly mistaken, there is nowhere that eurostar needs that on HS1
 

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,391
Location
Essex
Ah, apologies, I thought that was at Dollands Moor. Isn’t that to do with pantograph height settings?
Yes, and I think it does something to the fire doors too, and also sets the clocks to Continental time. The process for a driver though is exactly the same as if going from a 25kv section to a 1500v one so they're all just treated as "voltage changes".
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
At the Italian/Swiss border station, with incompatible overhead electrification (3kV DC/15kV AC), I recall the wires ended on approach, and restarted on the new system at the departure end. Incoming trains lowered their pantographs on approach before their wires ended, and braked to a stop in the platform. A diesel shunter then coupled up to the loco, pulled it forward, and then uncoupled and gave it a mighty shunt at speed, the electric loco then rolling back through the station and coming under its own wires again.
My recollection is that all trains entering Swiss frontier station elecrified on something other than 15kV was that trains were routed only platforms wired on the system they would depart on. There were four current shunting locos to recover the stranded loco after it had coasted in with pantograph down. Then the Departure loco could come in under its own steam.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,218
Yes, and I think it does something to the fire doors too, and also sets the clocks to Continental time. The process for a driver though is exactly the same as if going from a 25kv section to a 1500v one so they're all just treated as "voltage changes".
I seem to recall it's also something to do with the 50Hz frequency, where the pulses are a national standard but are thus fractionally different between UK and France at a boundary between the two. For the same reason the major power transmission cable between UK and France under the Channel converts to DC on one side, and is reconverted back to AC of the recipient country on the other side. For some reason it needs to be more complex than a normal neutral section.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
I seem to recall it's also something to do with the 50Hz frequency, where the pulses are a national standard but are thus fractionally different between UK and France at a boundary between the two. For the same reason the major power transmission cable between UK and France under the Channel converts to DC on one side, and is reconverted back to AC of the recipient country on the other side. For some reason it needs to be more complex than a normal neutral section.
I'm a bit sceptical of this, because normal neutral sections insulate between 25kV supplies that are very much out of phase with one another, and that's the same thing between different powergrids that aren't synchronised.
The explanation about different mechanical settings for the pantograph makes more sense because when you look at a class 373 power system selector switch, it has a different mode for LGV as well. (Image is from this twitter post)
Dq6sXj9XgAEm_N9

From left to right the options are:
- BR AC for North of London working,
- HS1 AC,
- BR DC which now does nothing of course
- EuroTunnel AC
- LGV AC
- French classic lines AC
- Belgian DC (3kV)
I guess this one doens't have a French Classic Lines DC (1.5kV) for whatever reason, or maybe it's around the corner and we can't see it.
But the noteworthy point is that it has 5 different modes for 25kV AC which will be for what the maximum height can be or whether the height is fixed as well as probably other stuff too

Out of interest, is there a neutral section within the Channel Tunnel or is it fed only by one side at a time?
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,308
Location
Herts
On the London area DC lines , we once had a 3 car ECS 313 , who accepted the wrong route at Gunnersbury and who made a valiant attempt at reaching the District line , luckily he failed , and as it was causing some issues to LUL they very kindly sent a pair of battery electric locos to return it to its proper working environment ! - very embarrasing to all !
 

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,391
Location
Essex
I'm a bit sceptical of this, because normal neutral sections insulate between 25kV supplies that are very much out of phase with one another, and that's the same thing between different powergrids that aren't synchronised.
The explanation about different mechanical settings for the pantograph makes more sense because when you look at a class 373 power system selector switch, it has a different mode for LGV as well. (Image is from this twitter post)
Dq6sXj9XgAEm_N9

From left to right the options are:
- BR AC for North of London working,
- HS1 AC,
- BR DC which now does nothing of course
- EuroTunnel AC
- LGV AC
- French classic lines AC
- Belgian DC (3kV)
I guess this one doens't have a French Classic Lines DC (1.5kV) for whatever reason, or maybe it's around the corner and we can't see it.
But the noteworthy point is that it has 5 different modes for 25kV AC which will be for what the maximum height can be or whether the height is fixed as well as probably other stuff too

Out of interest, is there a neutral section within the Channel Tunnel or is it fed only by one side at a time?
There are 2 neutral sections inside the tunnel and one just outside on the French side.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
There are 2 neutral sections inside the tunnel and one just outside on the French side.
Oh how interesting, are those near to the "English" and "French" crossovers?
Also, this would suggest that the tunnel is supplied by both countries and one of those neutral sections is a midpoint between GB and French powergrids.
 

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,391
Location
Essex
Oh how interesting, are those near to the "English" and "French" crossovers?
Also, this would suggest that the tunnel is supplied by both countries and one of those neutral sections is a midpoint between GB and French powergrids.
One is just inside at the UK end and one is midway through!
 

rower40

Member
Joined
1 Jan 2008
Messages
577
An extremely long time ago…(21st June 1986 so says wikipedia!)
The first Network Day, celebrating the creation of Network SouthEast, allowed very cheap travel all across the region.
One of the trains I took was from Hastings to Ashford. It was an EMU (of type unremembered) propelled by a class 33. This consist failed somewhere in coastal Sussex or Kent, and was rescued by both a class 73 (which didn’t get us very far) and then a Hastings-gauge DEMU.
So this was an instance of an EMU (hiding somewhere in the entire train) on a non-electrified line.
Was anyone else here on board that train?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
An extremely long time ago…
The first Network Day, celebrating the creation of Network SouthEast, allowed very cheap travel all across the region.
One of the trains I took was from Hastings to Ashford. It was an EMU (of type unremembered) propelled by a class 33. This consist failed somewhere in coastal Sussex or Kent, and was rescued by both a class 73 (which didn’t get us very far) and then a Hastings-gauge DEMU.
So this was an instance of an EMU (hiding somewhere in the entire train) on a non-electrified line.
Was anyone else here on board that train?
Might it have been a 4TC (4 coaches, Trailer Control)?

Best known for use with 4REPs (4 coaches, Restaurant Electro-Pneumatic brake) on the Waterloo to Bournemouth and on to Weymouth services, where the 4REP which had electric motors would push the trailer unit to Bournemouth, detach and a 33 would then take over to Weymouth and the opposite in reverse.

The 4TCs also saw use with 33s on some other workings, including to Salisbury among others.

While classified as an EMU, they had no traction motors.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
One is just inside at the UK end and one is midway through!

ah interesting, I've seen that there are also neutral sections on the CTRL lines where they meet ET tracks between Dollands Moor and the Folkstone Terminal area. Those will be for separating HS1 and ET supplies, the latter of which also powers Dollands Moor yard although under Paddock Wood's supervision oddly enough. But if there are further neutral sections at each tunnel portal, I wonder if this is somewhat for ease of emergency isolations. Maybe also the idea that if the main British power supply went fully offline, the tunnel section would be powered fully from France, but Folkstone Terminal/Dollands Moor would share power from HS1
 

Steve Harris

Member
Joined
11 Dec 2016
Messages
1,193
Location
ECML
Oh how interesting, are those near to the "English" and "French" crossovers?
Also, this would suggest that the tunnel is supplied by both countries and one of those neutral sections is a midpoint between GB and French powergrids.
I saw a programme last year (can't remember if it was TV or an old TV programme on youtube) on the channel tunnel and if I remember correctly the tunnel is supplied by both countries but i think normally it's configured to be supplied by 1 country with the other countries supply only to be used as a backup. The same applies with the signalling (there are duplicate signal boxes with 1 normally in use and the other (in the opposite country) is a backup incase the power supply or fire alarm, evacuation of signalling centre etc means the normal 1 is knocked out of action).


Edit: The programme in question was
 
Last edited:

rower40

Member
Joined
1 Jan 2008
Messages
577
Might it have been a 4TC (4 coaches, Trailer Control)?
Certainly could have been - at the time I wouldn’t know the difference. But were 4TCs often seen that far east? As you put, they were usually used on the line to Weymouth.
 

contrex

Established Member
Joined
19 May 2009
Messages
1,655
Location
St Werburghs, Bristol
Weren't the Bulleid/Raworth Co-Co booster electrics supposed to be able to venture into an unelectrified siding and bring back a wagon or two, using the rotating mass of the booster sets to generate?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
Certainly could have been - at the time I wouldn’t know the difference. But were 4TCs often seen that far east? As you put, they were usually used on the line to Weymouth.
They did see some use on special workings at times, but yes certainly out of their normal way.

Not impossible though, I mean a 319 went part way into the Channel Tunnel for instance! ;)
 
Joined
15 Apr 2020
Messages
401
Location
Wakefield
As has been mentioned a couple of times, coasting, either ‘high speed’ or ‘low speed’ happens a lot, particularly on ECML 2 track sections. There was a recent thread about it which I can’t currently find.

It is used where the overheads are damaged or switched off, and can be done at up to line speed. Passengers are usually none the wiser and can often be done without even losing time all being well.

Intentionally routeing electric only trains off the wires is not a regular thing though.
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
It's been used on the GEML, when work is taking place on one pair of tracks, trains have run on the other with the power switched off between Shenfield to nearly Stratford. There was a thread about it here a while ago with some technical detail, and indeed some members had driven it. With initial impetus of descending Brentwood bank, it's then gently downhill all the way. Special signs are erected for it:


At the Italian/Swiss border station, with incompatible overhead electrification (3kV DC/15kV AC), I recall the wires ended on approach, and restarted on the new system at the departure end. Incoming trains lowered their pantographs on approach before their wires ended, and braked to a stop in the platform. A diesel shunter then coupled up to the loco, pulled it forward, and then uncoupled and gave it a mighty shunt at speed, the electric loco then rolling back through the station and coming under its own wires again.
This also used to happen at Chiasso when an Italian loco and coaches on a service further north eft the DC overheads south of the platforms and coasted into the station. It was then removed by a SBB shunter to allow a Swiss loco to take the train on to Zurich. The Italian loco was then returned to the DC overheads.

== Doublepost prevention - post automatically merged: ==

I saw a programme last year (can't remember if it was TV or an old TV programme on youtube) on the channel tunnel and if I remember correctly the tunnel is supplied by both countries but i think normally it's configured to be supplied by 1 country with the other countries supply only to be used as a backup. The same applies with the signalling (there are duplicate signal boxes with 1 normally in use and the other (in the opposite country) is a backup incase the power supply or fire alarm, evacuation of signalling centre etc means the normal 1 is knocked out of action).


Edit: The programme in question was
I saw some years ago that the normal situation is for the entire Eurotunnel system to be fed from France with the UK feed as a backup because French power is cheaper.
 
Last edited:

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,683
I'm a bit sceptical of this, because normal neutral sections insulate between 25kV supplies that are very much out of phase with one another, and that's the same thing between different powergrids that aren't synchronised.
The explanation about different mechanical settings for the pantograph makes more sense because when you look at a class 373 power system selector switch, it has a different mode for LGV as well. (Image is from this twitter post)
Dq6sXj9XgAEm_N9

From left to right the options are:
- BR AC for North of London working,
- HS1 AC,
- BR DC which now does nothing of course
- EuroTunnel AC
- LGV AC
- French classic lines AC
- Belgian DC (3kV)
I guess this one doens't have a French Classic Lines DC (1.5kV) for whatever reason, or maybe it's around the corner and we can't see it.
But the noteworthy point is that it has 5 different modes for 25kV AC which will be for what the maximum height can be or whether the height is fixed as well as probably other stuff too

Out of interest, is there a neutral section within the Channel Tunnel or is it fed only by one side at a time?
I understand the selector also determined power consumption limits. For example the GV(Grande Vitesse / high speed) position allows the train to draw full power from the 25kV AC supply, whereas the BR setting limits the amount of power drawn by the train and affects acceleration. Similarly the F (France) 25kv setting allows a greater power draw than BR 25kV settings, but not as much as in the GV setting.
 