Edinburgh-Aberdeen route will "end up with discontinuous electrification

Status
Not open for further replies.

Haribolover06

Member
Joined
20 Nov 2021
Messages
43
Location
Aberdeen
ScotRail’s Edinburgh-Aberdeen route will “end up with discontinuous electrification”, a leading rail engineer has said...
...“In the current climate, where money is really tight, we’re going to do some work between Dundee and Arbroath, and then we’re going to do an area to Montrose where we’re going to close all boxes and get that into a computer, into a VDU box station,” said Braid, who is also signalling programme director for Siemens in Scotland...

There are definitely some tricky bits of track to electrify from Aberdeen to Edinburgh. The Forth and Tay Bridges comes first on the list, but it is all realistically possible.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,496
Location
Over The Hill
"For example, Dock Street tunnel in Dundee: how do we get the wires through there? It’s really difficult.

“Dundee station sits below the waterline of the Tay, so it’s really challenging from an engineering perspective.”
That's not so different to the Severn Tunnel. Has he heard of solid bar electrification? Might that method also be possible for the two big bridges?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,342
The question is not so much whether it is possible to fully electrify.

The question is whether it is worth the effort.
 

N1

Member
Joined
10 Aug 2022
Messages
385
If the political will is there it can get done.
Who's political will. Scottish Government can't legally overspend. There is another thread on how block grant is decreasing in real terms in the next five years.

It might not be a perfect strategy, bit the slow and steady electrification strategy in Scotland has contributed to the reduction in costs per single track kilometre. And this gives nearly all the benefits of full electrification.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,513
Location
Preston Lancs
Who's political will. Scottish Government can't legally overspend.
No, but with political will, money can not be spent somewhere else and spent on decarbonisation/electrification. So to answer your question "The Scottish Governments political will.

It might not be a perfect strategy, bit the slow and steady electrification strategy in Scotland has contributed to the reduction in costs per single track kilometre. And this gives nearly all the benefits of full electrification.
I totally agree and have said so multiple times on this forum.
 