Good commitment there - well done!Eventually got home at 3am after staying behind past my rostered hours to assist with the disruption.
Good commitment there - well done!Eventually got home at 3am after staying behind past my rostered hours to assist with the disruption.
And as for the third rail... just you wait until we get some properly wintry weather again. The 1048 departure from Redhill to London Victoria (originating South of Horsham) was supposedly delayed by 198 minutes last Wednesday due to a very small quantity of freezing rain on the rails at Christs Hospital. And there are countless other examples, many of which are worse, each year!
Good commitment there - well done!
It's time Network Rail come out with plans to replace all of the problem OHLE on the East Coast line (all of itThe ECML is not a benchmark to measure OHLE against. It serves as an example to ensure that all new electrification projects are not done the same way!
It's time Network Rail come out with plans to replace all of the problem OHLE on the East Coast line (all of it)
The cost to the railway companies,passengers and to the economy of all these failures over the years must be huge.
There was an awful lot of work done 3 or 4 years ago, at least on the southern section (from WGC at least, possibly further north?).
I remember it well because it was when I was quite regularly using my season ticket to go into London at weekends and for two years in a row, almost six months had no services at weekends due to this upgrade work.
I imagine the government would need to stump up the cash for it. I doubt a complete OLE renewal of the ECML is in NRs budget.
The ECML is not a benchmark to measure OHLE against. It serves as an example to ensure that all new electrification projects are not done the same way!
ITVs Anglia Tonight also interviewed Robin Gisby & even after he appologised & accepted it was NRs fault several times they still trawlled out "do you realise these passengers pay out thousands of £s a year for season tickets", well doh no sugar sherlock. What did they want from him ...blood!!!
Shouldn't we be making sure our existing OHLE is fit for purpose before blowing billions on new electrification projects? This sort of problem doesn't quite happen with the diesels they wish to replace..
OHL line problems are often reported all over the network. A broken pantograph will potentially do serious damage to the most modern OHL kit as will wind blown debris, problems that 3rd rail is immune to. Of course if a train loses all shoes it won't get far but as soon as it's been cleared away normal service can resume as the 3rd rail is most unlikely to have been damaged.
--- old post above --- --- new post below ---
As the BBC failings show journalists expect perfection from everyone...except themselves when any old rubbish will do.
--- old post above --- --- new post below ---
Or ripping up very reliable 3rd rail in favour of unreliable OHL! Heating Strip solves icing and is being installed now with out disrupting services.
Or in the case of the ECML, a passenger on a nearby platform coughing.