ECML -ohle issue at Stevenage (20/09)

Status
Not open for further replies.

800001

Established Member
Joined
24 Oct 2015
Messages
7,377
Somebody jumped off a bridge at Huntingdon earlier too. It was all cleared before the line reopened though.
There was a report from someone saying someone had jumped, but they had not. No one was on the line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Julia

Member
Joined
19 Jun 2011
Messages
379
Up fast services will have high speed coasting.

LNER saying on social media that there's no up services calling at Stevenage until Sunday morning (down services unaffected).

No capacity to put the ones that would otherwise stop into platform 1?
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,368
The 2300 London to York was cancelled. Does anyone know what happened with the York passengers?
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,882
The 2300 London to York was cancelled. Does anyone know what happened with the York passengers?
"Customers are advised to join the 23:33 LNER service to Leeds.
Customers travelling to York will be provided road transport from Doncaster."
 

D1537

Established Member
Joined
11 Jul 2019
Messages
2,075
Location
North Yorkshire
"Customers are advised to join the 23:33 LNER service to Leeds.
Customers travelling to York will be provided road transport from Doncaster."
In the end, the 23:33 Leeds easily made the heavily delayed 1N35 at Peterborough, so pax could use 1N35 to York anyway (and would have arrived at 02:39, 71 late, thus getting their delay repay as a bonus).
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,377
LNER saying on social media that there's no up services calling at Stevenage until Sunday morning (down services unaffected).

No capacity to put the ones that would otherwise stop into platform 1?
There is the fear that when they slow to cross from up fast to up slow, that they would potentially slow trains down in rear and put them at risk of not been at correct speed for the high speed coasting.
 

philjo

Established Member
Joined
9 Jun 2009
Messages
3,021
There is the fear that when they slow to cross from up fast to up slow, that they would potentially slow trains down in rear and put them at risk of not been at correct speed for the high speed coasting.
Couldn’t the services calling at Stevenage switch to the slow line at Hitchin to avoid this potential problem?
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,803
Location
Central Belt
Couldn’t the services calling at Stevenage switch to the slow line at Hitchin to avoid this potential problem?
Congestion may still be an issue. When you look at the trains at the top of the hour it could mess up Digswell nicely if anything went wrong.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,377
Couldn’t the services calling at Stevenage switch to the slow line at Hitchin to avoid this potential problem?
No. The damage is north of Stevenage station, unsure how long the isolated section is. But even Hitchin the trains may not be up to required line speed, I’m sure if that was possible they would be doing so.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,803
Location
Central Belt
No. The damage is north of Stevenage station, unsure how long the isolated section is. But even Hitchin the trains may not be up to required line speed, I’m sure if that was possible they would be doing so.
I interpreted the post as meaning that the trains would join the slow line north of Hitchin stations and then stay on the slow. Which of course means they will get tangled up with GTR services stopping at Hitchin. I am correct in thinking the slow is operating normally? Not seeing significant delays on services stopping at Welwyn Garden City this afternoon.

Another question, How long does it take to fire up the bi-modes? The Lincoln / Harrogate services could run on Diesel (I suspect it isn’t that simple)
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,377
I interpreted the post as meaning that the trains would join the slow line north of Hitchin stations and then stay on the slow. Which of course means they will get tangled up with GTR services stopping at Hitchin. I am correct in thinking the slow is operating normally? Not seeing significant delays on services stopping at Welwyn Garden City this afternoon.

Another question, How long does it take to fire up the bi-modes? The Lincoln / Harrogate services could run on Diesel (I suspect it isn’t that simple)
The trains slowing to go up fast to up slow at Hitchin, would impede electric services running behind them, they need to be at line speed for the high speed coasting, services are lowering pantograph 4 signals south of Hitchin.
Bimode are running diesel Peterborough to Kings Cross.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,803
Location
Central Belt
The trains slowing to go up fast to up slow at Hitchin, would impede electric services running behind them, they need to be at line speed for the high speed coasting, services are lowering pantograph 4 signals south of Hitchin.
Bimode are running diesel Peterborough to Kings Cross.
OK thanks, So if they were to move to the slow it would need to be much further north, so more risk of delay for the stopper. So not really worth it.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,399
Location
The Fens
The trains slowing to go up fast to up slow at Hitchin, would impede electric services running behind them, they need to be at line speed for the high speed coasting, services are lowering pantograph 4 signals south of Hitchin.
The same consideration is applying with the Kings Lynn-Kings Cross trains. These normally come round the curve off the branch at 40mph and cross to the fast line at Hitchin South, sometimes resulting in signal checks for trains coming up the fast line from the Peterborough direction. From what I can see it appears that the Kings Lynn-Kings Cross trains are staying on the slow line to Woolmer Green so that they don't impede trains that need to coast on the fast line.
 

OscarH

Established Member
Joined
15 Sep 2020
Messages
1,288
Location
Crawley
High speed coasting isn't ideal if it can be avoided. Using the available diesels seems wise to me.
Makes sense, I was thinking if its deemed fine for the electric only trains then why not, but I guess if it's still got a less than ideal amount of risk then it's worth the diesel
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,153
Is there a reason for these not to coast too?
After coming off the branch, and crossing to the fast can they get up to full speed before coasting starts?

Also when they cross to the fast lines there's the risk that the trains could slow down a following train just before it needs to start coasting.
 

OscarH

Established Member
Joined
15 Sep 2020
Messages
1,288
Location
Crawley
After coming off the branch, and crossing to the fast can they get up to full speed before coasting starts?

Also when they cross to the fast lines there's the risk that the trains could slow down a following train just before it needs to start coasting.
I thought that referred to 80x bimodes on the mainline rather than anything off a branch/crossing lines (my geography round there may be wrong), for anything off a branch diesel definitely makes sense
 

ST156

Member
Joined
10 May 2014
Messages
154
Is there temporary lineside signage installed to remind drivers of where to lower / raise the pantograph?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,377
Is there temporary lineside signage installed to remind drivers of where to lower / raise the pantograph?
Yes. There’s a warning sign, a lower pantograph sign and a raise pantograph sign.
Drivers also get a GSMR broadcast from relevant signaller, and certain TOCS also issue paperwork at stations to drivers with all details in.
 

apinnard

Member
Joined
2 Aug 2017
Messages
386
Location
Kettering
Yes. There’s a warning sign, a lower pantograph sign and a raise pantograph sign.
Drivers also get a GSMR broadcast from relevant signaller, and certain TOCS also issue paperwork at stations to drivers with all details in.
There was a guy at the business end of Peterborough platform 3 yesterday giving paperwork to the handful of LNER drivers I saw that stopped there.
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,368
What is the latest regarding when southbound trains through Stevenage should be back to normal?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,377
What is the latest regarding when southbound trains through Stevenage should be back to normal?
8 hour possession this evening to complete repairs.
Normal working ‘should’ resume from start of service Sunday.
 