ECML disruption in the Darlington area (04/08)

Status
Not open for further replies.

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,413
Location
Yorks
Everything seems to be stopped at Darlington. Is there any news on what the ptoblrm is ?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,631
Location
Northampton
1E22 Aberdeen Edinburgh to King's Cross appears to be moving slowly between Darlington and Northallerton (the only thing doing so) according to OTT but is formed of an 801 according to RTT so would have thought it's on OLE. 9G18 was stuck behind A Lumo and an LNER north of Darlo and is being sent back to Durham by the looks of things.
As I type, 5P23 has been given the road from the South Passenger Loop, so perhaps the blockage is beginning to clear.
 
Last edited:

185143

Established Member
Joined
3 Mar 2013
Messages
5,367
1E22 Aberdeen to King's Cross appears to be moving slowly between Darlington and Northallerton (the only thing doing so) according to OTT but is formed of an 801 according to RTT so would have thought it's on OLE. 9G18 was stuck behind A Lumo and an LNER north of Darlo and is being sent back to Durham by the looks of things.
As I type, 5P23 has been given the road from the South Passenger Loop, so perhaps the blockage is beginning to clear.
That's impossible unless there's been a swap somewhere.
 

oldchap

Member
Joined
25 Aug 2015
Messages
19
On 1S26 KGX to EDB delayed on York. Announcement suggests we will be moving soon.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,385
OHL is turned off between Aycliffe and Hutton Bonville.

Lines have reopened to diesel at 20mph, with down service using the down passenger loop.
LNER 801s will use their single generator unit.

Believed to be a bond wire which has come down, catenary wires believed to be intact.
 