jammmmmsssssss
Member
I don't know, I just read national rail and looked at opentraintimesIs Sunday the worse time for this kind of thing to happen because all the experts / machines are tied up on engineering work elsewhere?
I don't know, I just read national rail and looked at opentraintimesIs Sunday the worse time for this kind of thing to happen because all the experts / machines are tied up on engineering work elsewhere?

Back then they'd probably have worked on the track with trains passing on adjacent lines, which I think is a no-no these days. It was likely better for keeping the service running, but worse for the accident statistics and life expectancy of the workers. Many such things are trade-offs that way, and society's preference changes over the years.No doubt an LNER pw gang would have fixed it in 1937 overnight with hand tools!!![]()
GCC? Gulf Cooperation Council? Not that I see what relevance they have to the situation!That was GCC.
Plus there were a lot more of them around quite apart from the less safe working practices! Maintenance is one of those areas where the numbers have been whittled away over the years in the name of efficiency. No doubt it is very efficient when everything is working well. But sometimes you need the resilience that extra trained bodies brings...Back then they'd probably have worked on the track with trains passing on adjacent lines, which I think is a no-no these days. It was likely better for keeping the service running, but worse for the accident statistics and life expectancy of the workers. Many such things are trade-offs that way, and society's preference changes over the years.
Gauge Corner Cracking. Not that I really know what I'm talking about, I just know the term!GCC? Gulf Cooperation Council? Not that I see what relevance they have to the situation!
How long does it rake to fix a broken rail? It's still all mucked up this morning.
FROM LNER: There is a broken rail on one of the two southbound lines in the Hatfield area. This was found by Network Rail teams yesterday, 1 September.
Staff are dealing with this as quickly as possible, but work to fully fix the defective rail will take a considerable amount of time. Work was started last night, but will now have to continue tonight as well. This means the affected line will remain closed today, and disruption will continue.
Until a Permanent Way Engineer swings by, this might help:Gauge Corner Cracking. Not that I really know what I'm talking about, I just know the term!
www.railengineer.co.uk
The Hatfield rail break was caused by fatigue cracking, originating from the surface of the head of the rail. This type of defect is known as rolling contact fatigue (RCF) or, when it develops from the gauge corner, gauge corner cracking (GCC). This type of defect usually involves the development of a series of cracks in close proximity which initially form at a shallow angle. If allowed to grow, cracks tend to turn down deeper into the head of the rail. They then can grow quicker and eventually result in a broken rail. As RCF cracks generally develop close together, the rail can, in severe cases, shatter rather than break in a fairly clean transverse break. The close proximity of RCF cracks can also mask accurate ultrasonic signals.
Shattered rails present a greater risk of derailment as the wheel loses contact with the rail head as occurred at Hatfield.
Low carbon content in the steel from what i recall.Gauge Corner Cracking. Not that I really know what I'm talking about, I just know the term!
The trains are crossing over to the fasts just after Potters Bar so I don't know why they're not stopping at Hadley WoodThe ECML seems to be coping well now (Unless you are at one of the 3 stations that have no Southbound service)
Don’t know why but I thought there was a cross-over point at Potters Bar, I guess it must be at New Barnet as Hadley wood still has no service.
This morning was frustrating- but not sure if that was as much to do with displaced crews as it was with Network Rail trying to fix the line.
This would suggest that the problem is with is the 70 mph Marshmoor crossover so it is likely to take longer than welding up a plain rail.Staff are dealing with this as quickly as possible, but work to fully fix the defective rail will take a considerable amount of time. Work was started last night, but will now have to continue tonight as well. Part of a junction is having to be replaced, as this is where the rail is located.
It also opens up the debate about which trains house have priority over the limtied capacity available. GN didn’t run anything before 0630 when they started the Moorgate service up. I saw some LNER services got through.
At the moment it appears the service is as follows.
LNER / Lumo and GC - Normal services (with delays at Hatfield)
Welwyn Garden City - Moorgate. Running but not stopping Hatfield - New Barnet to make room for fast trains.
Cambridge - London - Not operating
Peterborough - London - Not Operating
Welwyn Garden City - Sevenoaks - Not operating North of Blackfriars
Kings Lynn - London - Operating with cancellations
Peterborough - Horsham - Operating
Hertford Loop - Cancellations to allow fast trains do divert (although not sure if they are all going via Welwyn)
Cambridge - Brighton - Operating with cancellations
No service for Knebworth, Welwyn North, Welham Green, Brookmans Park and Hadley wood on the Welwyn Side
The Hertford North route seems to very little operating.
Gainsborough line? That's Marks Tey to SudburyAnd now there's overhead line problems near Grantham! There's never a normal day on the ECML...
== Doublepost prevention - post automatically merged: ==
Looks like no trains are running through Peterborough - Doncaster, 1A04 (06:05 Leeds - London Kings Cross) is waiting for a thunderbird to divert it via the Gainsborough lines, currently around 25 down.
== Doublepost prevention - post automatically merged: ==
The thunderbird is now coupling up to the I225 set.
OopsGainsborough line? That's Marks Tey to Sudbury
Well if they have the route knowledgeOopsI'll swap it with the correct one.
== Doublepost prevention - post automatically merged: ==
1A91 (0605 Beverly - London Kings Cross) has now made it to Doncaster, presumably it'll switch to diesel power and divert via the joint lines?
Seems to be with 1A91 the first train throughOh dear. Just on my way to NCL for the 0800 to KGX. Fingers crossed it’s passable by then!
It looks like the ex Beverley ran through on normal route, albeit picking up a 30 min delayOopsI'll swap it with the correct one.
== Doublepost prevention - post automatically merged: ==
1A91 (0605 Beverly - London Kings Cross) has now made it to Doncaster, presumably it'll switch to diesel power and divert via the joint lines?