Waste of time, just grade seperate Norton Bridge and the vast majority of the problem goes for a fraction of the cost.
Waste of time, just grade seperate Norton Bridge and the vast majority of the problem goes for a fraction of the cost.
I think the only feasible way to circumvent the problem would be a second viaduct, but with the number of NIMBYs' in the area, as mentioned above, that would be unlikely. I'm all for ingenious viaduct widening plans though!
I agree, but if it was built alongside so in effect it's just wider, what would anyone actually lose in terms of the view.
If it was built in keeping with the same style and the Government was clever enough to bribe them with more services from Welwyn North etc, then I am not sure why anyone would complain - besides complaining for the sake of complaining.
To me, it's the cost that would probably stop this happening. Without having a perfect memory of Welwyn North, could you in theory expand this to have the track open out to allow stopping trains to stop outside and allow fast trains through? I'm not sure that would create many extra paths, but it could be a lot cheaper - unless the station is right by the tunnel?
The other idea is of course to have two tracks divert off, following the A1(M) and then coming back in towards Stevenage (or even AT Stevenage) somehow. That would require compulsory purchasing and probably a few bridges, but it would be cheaper. Yes, some services may then skip Stevenage altogether but is that a real problem? The capacity running the old way remains the same, so as many trains could stop as do now.
50 lorries a day, every day for 5 years. You can see why people would complain. Also, the locals in that area are very well connected and would put up a mean challenge. Even if you beat them you'll be looking at 20 years until completion.
The thing with the A1(m) is that it goes over the very hill that the trains run through. Going North you'd never get a train up it. Mind you, coming South, even the Rocket could break Mallards record![]()
--- old post above --- --- new post below ---
To be a bit more realistic, there are two things we could do straight off.
- Reroute the Cambridge fasts into Liverpool Street or stop them at Stevenage and Hitchin. They don't contribute to the ECML and take up an extra path. Either make them contribute or send them somewhere else.
- Relay the connection from the Down Leeds into York station, thus providing a fourth approach from the south and a bit more operational flexibility.
HS1 and various LGV routes tackle similar gradients every day. Coming off the Medway Viaduct, there is a gradient roughly equivalent to the Lickey Incline, tackled at 186 mph with trains that have so much kinetic energy that it's not noticeable.
I would say the Cambridge fasts contribute the ECML by the fact that they are full, If you use that logic the we should get rid of Grand Central's service to Bradford from the ECML
Yes. Get rid. Not to St P, just get rid generally. Or at least force them to couple to Hull services at Doncaster to stop wasting a path.
I would say the Cambridge fasts contribute the ECML by the fact that they are full, If you use that logic the we should get rid of Grand Central's service to Bradford from the ECML and force them to use St Pancras instead!
The other thing to remember is the Cambridge trains, The Liverpool Street route is full with Stansted Express services, so no paths anyway.
The "Cambridge Cruiser" Certainly merits its place on the ECML in terms of the loadings it has. Look at it in the peak and it has more passengers on it then trains to minor destinations like Leeds & Newcastle.
Yes. Get rid. Not to St P, just get rid generally. Or at least force them to couple to Hull services at Doncaster to stop wasting a path.
As for the rest of this thread, the more I think about it the more I'm ultimately in favour of a HS2 approach - a brand new line built without the bottlenecks that creates additional capacity for all services.
Maybe instead of building HS2 all the way to Lancashire/ Yorkshire we'd be better with three or four shorter lines (Peterborough/ Birmingham/ Didcot/ Basingstoke) which would resolve a lot of the capacity problems.
Tinkering with Welwyn will be expensive and disrupt the railways for years; a brand new line for 100 miles outside London would be constructed without affecting existing lines.
How much time would looping the stoppers at Gordon Hill put into those services though? I'd suggest 8 minutes at a minimum, before considering the performance issues of a late running express either delaying the stopper further, or missing its path and becoming immediately heavily delayed!I have a 'cheap(ish) grand plan' for the southern end of the ECML that I'll bore you all with another time but in dealing with the Welwyn Viaduct my solution for this is to route the two fast Cambridge services via the Hertford Loop. The existing slow services would pull over at Godon Hill (old loops put back) and allow the fasts through. A little extra point work at Hertford North, and maybe a siding/loop north of Hertford North to ease terminating serices would all go to help.
I have actually put together a very rough timetable that allows four fasts and four stoppers on the loop. The increase in journey time for the Cambridge services is about 6 minutes. Remember, though, that the present timings are relatively new. It wasn't that long back that the quickest journey time was well over an hour. I'd also put an alternating Leeds, Newcastle slow service in the other two paths (or even freight!).
I agree that running half-length trains is hardly making the best use of finite capacity. Joining long-distance portions at Doncaster - a busy station with fairly limited platform space - is a big performance risk though, especially if each of the two portions is operated by a different company! Doing anything on a regular basis with passenger trains on goods lines or sidings south of the station is a big no-no too.And with Open Access... I'd make it a condition that if they insist on using 1/2 length trains they must run two together, and not just accross the viaduct but all the way to Doncaster. If they can't split in the station, let them do it in the yard south of the station.
That's an interesting idea, but I think it would be better to go with an upgrade of the existing lines over these sections unless capacity is a serious issue (such as on the WCML) or the line is third rail electrified. The main reason for this is that it gives you the chance to use existing stations at Didcot, Reading, Slough, Peterborough and Stevenage. Perhaps if there is a high speed link to Heathrow, that could be incorporated into the Great Western version.
How much time would actually be lost with stops at Hitchin and Stevenage (on the Cambridge fasts) or Doncaster and Peterborough (on the GCs). I've often seen suggestions that you could use 90s to get to Cambridge, recouping the extra stops by running at 110 from Wood Green to Stevenage. That doesn't allow for overhead wire issues on the Cambridge branch, or slower acceleration, but the main point would actually be to increase the number of Stevenage-London shuttles. With the GCs, that gives a chance for people other than Londoners to have a reasonably direct service to non-EC destinations.
.
They Cambridge fasts from experience don't have enough capacity for extra stops, it would mean passengers standing.
However thinking along the same lines, I guess their is nothing to stop splitting trains on route.
For example in the peak run a 12 car train to Hitchin, split the train at Hitchin send the front 8 to Peterborough and the rear 4 to Cambridge (all stations). I don't think capacity is such an issue off peak.
I am sure Finsbury Park, Stevenage and Hitchin can all take 12 car trains. The Cambridge fasts can also be 12 car. Most IC services are full length in the peak anyway (don't class the 1650 as peak)
I am sure Finsbury Park, Stevenage and Hitchin can all take 12 car trains.
Finsbury Park currently only takes 8 car trains although there are plans afoot by September 2011 to extend the platforms to take 12 car trains.
The stations below all take 12 cars:
Peterborough*1
Huntingdon
St Neots
Stevenage
Royston*2
Cambridge*3
Ely
Kings Cross*4
*1 Platforms 2 to 5 only
*2 Platform 1 only
*3 Platforms 1 and 4 only
*4 Platforms 0 to 8 only
But at places at Watford, I'm not sure there will be capacity to have an extra 5-10 minutes dwell time. It would also obviously slow the journey times down
I did think afterwards that the Northbound platform at Finsbury park could not but I was sure the Southbound could.
What trains are already 12 cars (or planned to be from Dec) from KX. I know the 1807 London - Peterborough has been for a while.
How about, instead of trying to do something with Digswell viaduct, the old Welwyn GC to Hertford line was brought back. With both a north and south facing curve at either end (ie, so trains could run Hertford North - Welwyn GC, Hertford North - Hatfield, Bayford - Welwyn GC and Bayford to Hatfield). I'm not suggesting that those services could or should run, but you get the idea. I'd double track it and reopen the station at Cole Green, with the platforms on loops, so as not to obstruct any fast services. From Hertford North to Langley Junction, I'd double the track to four track and put in extra points and signals at Stevenage to allow trains from the Hertford Loop to use all four platforms.
I'm not sure which services would use it primarily, but I'd probably go for some express services. Alright, it's a bit of an arse about face route, but the majority of the track bed is still there. It'd cost time and money to reconnect at Hertford North and even more at Welwyn (the track there has been built over) and four-tracking from Hertford North - Langley Junction wouldn't be cheap either.
Oh yeah, I'd somehow extend the platforms at Hertford North to at least take 8-cars.
I doubt very much that anyone would reopen the old Welwyn Garden City to Hertford North route as it didn't actually go into Hertford North but curved off towards Hertford East and as Yorkie can confirm it's now a cycle route.
Not idea, I grant you, but paths are at a premium going out of London termini at that time of day, and it doesn't take ten minutes on Southern/ South Eastern to uncouple units
After a Southern arrives in Horsham as an 8/12 car train heading for Portsmouth & Bognor, at least part of the train will be in the platform until 9 minutes later.