I was wondering what people thought of how long it'll be before Network Rail gets to electrifying this section of line especially the Montrose-Dundee section?
I would say that I wish they would do it sooner as it is a major line though one other problem I see is the single line track from the bridge where Montrose South signal box used to be to Usan, any ideas how they would solve it?