Major delays at Retford today (I am on. 1E13 Inverness to KX). 90 late

Could the Lincoln Spalding route not have been used rather than what I assume is being piloted through the disruption?

I know not all Azumas have Diesel but this one must have as it came from Inverness.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Scotrail314209

Established Member
Joined
1 Feb 2017
Messages
2,475
Location
Edinburgh
I am currently on 1S21 (14:30 London to Edinburgh) carrying almost three trainloads of people due to the cancellation of the 14:00 Aberdeen and the 15:00 Stirling.

We are losing time en route due to the train being extremely busy, resulting in people trying to squeeze in. We have just left Newark and will likely incur more delay due to the problems at Retford.

It’s a mess today.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
The vast majority of LNER's fleet is unable to make use of the diversionary route, and the services worked by units that can use the diversionary route may not have been crewed by people that sign the diversionary route - only Leeds and Doncaster crews sign the diversionary route - most ex-Scotland trips are crewed by Newcastle and Kings Cross crews.
 

Sly Old Fox

Member
Joined
21 Jul 2008
Messages
448
Location
England
Sadly short notice diversions are rather tricky on the modern railway, that’s just the way it is set up.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,668
Location
Northampton
It's also about how much time you're actually losing through the disrupted area. Overall for all passengers, it may be better just to go slowly through the problem area.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,992
Location
Airedale
It's also about how much time you're actually losing through the disrupted area. Overall for all passengers, it may be better just to go slowly through the problem area.
On a quick check of RTT, LNER haven't sent anything via Lincoln and GC only one.
 

Marton

Member
Joined
9 Nov 2008
Messages
665
The vast majority of LNER's fleet is unable to make use of the diversionary route, and the services worked by units that can use the diversionary route may not have been crewed by people that sign the diversionary route - only Leeds and Doncaster crews sign the diversionary route - most ex-Scotland trips are crewed by Newcastle and Kings Cross crews.
Thank you. Helps me understand. The delay was c60 min. In total 90 as we were 30 late leaving York, although partly by sitting on the up slow north of York to let the Redcar Manchester service overtake. I presumed that was as we would be held up anyway.

Last time I did the diversion a few Saturdays ago that was an extra hour. The crew signing issue may explain the stop in Doncaster that day too.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Whatever the issue was seems to have cleared as stuff is now moving between Newcastle and Edinburgh in both directions, seemingly without issue.

RTT was showing 91119 for the 1800 Kings Cross to Edinburgh earlier. Obviously that won’t be what happens!
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,403
Whatever the issue was seems to have cleared as stuff is now moving between Newcastle and Edinburgh in both directions, seemingly without issue.

RTT was showing 91119 for the 1800 Kings Cross to Edinburgh earlier. Obviously that won’t be what happens!
1V64 for Crosscountry came to a stand at Cramlington with brake issues, and the parking brake stuck in.

Despite 2 drivers attempting to fix, it was not possible, and an Evacuation onto 1V68 was about to start, that was brought wrong line alongside.
On V68 was a driver manager, and they managed to release brake allowing the train to move forward at 30mph to Newcastle where it terminated.
 
Joined
11 Feb 2022
Messages
187
Location
Doncaster
Theft of signal cabling, multiple signals needing to be passed at danger due to emergency working
Each train needing to contact signaller and get permission to enter section and contact again when out

Network rail working to replace cabling but expected to be end of the day and into the night to get it all fixed
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,403
Theft of signal cabling, multiple signals needing to be passed at danger due to emergency working
Each train needing to contact signaller and get permission to enter section and contact again when out

Network rail working to replace cabling but expected to be end of the day and into the night to get it all fixed
Emergency working withdrawn at 1900.

However 3 signals D161 & D163 on the Down (Northbound) and D 164 on the Up (southbound), will need trains talking past them.

== Doublepost prevention - post automatically merged: ==

normal working has resumed on the UP line at Ranskill. Services on the Down line will be required to be talked past signal D163.
 
Last edited:

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,404
Lumo were forced to drop passengers in York on a mid morning service to go forward by LNER. Seems a bit odd they don't go to Doncaster to go forward with Hull Trains.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,615
Lumo were forced to drop passengers in York on a mid morning service to go forward by LNER. Seems a bit odd they don't go to Doncaster to go forward with Hull Trains.

Hull Trains only managed to run one train through to London anyway

 

800001

Established Member
Joined
24 Oct 2015
Messages
7,403
I believe a broken down CrossCountry Voyager added to the mess. 13:05 Edinburgh to Plymouth according to JourneyCheck terminated at Newcastle 'due to a fault on this train'.
4 posts up^^

== Doublepost prevention - post automatically merged: ==

Lumo were forced to drop passengers in York on a mid morning service to go forward by LNER. Seems a bit odd they don't go to Doncaster to go forward with Hull Trains.
There was only limited number of paths available due to the emergency special working in place.
Preference would have been given to LNER as per the route contingency plans in place, with blanket ticket acceptance across all TOCS and Open access operators.
 

Mitchell Hurd

On Moderation
Joined
28 Oct 2017
Messages
1,763
1V64 for Crosscountry came to a stand at Cramlington with brake issues, and the parking brake stuck in.

Despite 2 drivers attempting to fix, it was not possible, and an Evacuation onto 1V68 was about to start, that was brought wrong line alongside.
On V68 was a driver manager, and they managed to release brake allowing the train to move forward at 30mph to Newcastle where it terminated.