• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Ec is the new timetable working?

Status
Not open for further replies.

Yorkswatcher

Member
Joined
9 Feb 2011
Messages
105
So is the new timetable working?

So far ive been on 4 services and so far 4 delays. Noticed a few other companies suffering knock on delays.

Yesterdays 7:18 don to London had to wait for the late running 7:11 to head into and leave Doncaster and last nights 20:3(something) Northern Don to Leeds had to wait for the late running 20:20 Don to Leeds to leave the station.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,761
Location
Central Belt
So far 2 journeys - one 2 minutes late but it was given special treatment. The other was a typical journey on the ECML. 1500 ex KX - Edinburgh stuck behind late running XC service then followed an on-time local into Waverley after losing its path. New timetable same &£$t. To be honest I don't expect the PPM to be that good this week following the weather problems on Monday.
 

TheBigD

Established Member
Joined
19 Nov 2008
Messages
2,043
Their frlagship 4 hour 0540 Edinburgh-London has failed to arrive at London at the advertised time yet, or do the journey in 4 hours.

I know it only 3 days in but not a great start.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,761
Location
Central Belt
Their frlagship 4 hour 0540 Edinburgh-London has failed to arrive at London at the advertised time yet, or do the journey in 4 hours.

I know it only 3 days in but not a great start.

Pesky trains getting in the way ;) Some TSR between Doncaster and Newark won't help either but 0945 is probably more realistic but doesn't sound as good 4h5 minutes ;)
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
I know it only 3 days in but not a great start.

Not really surprising to be honest, in fact I would be amazed if it arrives at 9:40 more than one day in five. BR used to run services timed to do 3hr 59min and I seem to recall it being mentioned that they hardly ever arrived on time, I suspect that it is just about impossible to run the service at 4hrs without reducing traffic on the ECML drastically or increasing the line speed of some sections to 130-140mph.
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
. . . . . . I suspect that it is just about impossible to run the service at 4hrs without reducing traffic on the ECML drastically or increasing the line speed of some sections to 130-140mph.
And as neither of those are likely to happen, I wonder if we'll see some new 'small print' appearing soon, along the lines of :
[All times shown above are indicative]
or
[FS - arrival times may vary]
or
[Delay Repay not available on this service]

No. Surely not.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,833
Location
East Anglia
Their frlagship 4 hour 0540 Edinburgh-London has failed to arrive at London at the advertised time yet, or do the journey in 4 hours.

I know it only 3 days in but not a great start.

It only did it in 3h59m 30% back in the 90s according to Ms Holt. Cant see much will change this time round.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,656
Any timetable change of this magnitude takes a while to bed in, if it is all going pear shaped in a few weeks then obviously there are issues. The Dec 08 WCML timetable wasnt smooth at the beginning.
 

amcluesent

Member
Joined
19 Dec 2010
Messages
877
I've already got two Delay/Repays in.

TBH, it seems a nonsense that the 91's still can't reach their design speed of 140
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
it seems a nonsense that the 91's still can't reach their design speed of 140

Perhaps but as has been said many times before the costs associated with upgrading the signalling (mostly the cost of installing in-cab for the 91s/DVTs). As well as the problems of 140mph expresses having to interact with local and inter-regional services (75-100mph) at both the south end of the ECML (KGX-PBO) and the mid sections (GRA-NCL), in addition to the freight and 125mph expresses would be a nightmare of which the consequence would be a loss of paths and therefore services.
 

silentone

Member
Joined
16 Mar 2010
Messages
283
Hard to say if the timetable works when really today is the first day there has been no major incident. Infact today has gone rather well.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,656
Which doesnt mean the timetable doesnt work, the fact that no day will ever reach a 100% right time or PPM level suggests that timetables dont work at all.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,761
Location
Central Belt
From my personal experience Southbound very well, Northbound same old problems, stuck behind late running trains, poor regulation, all the things we know and love. However the extra padding is probably helping. Arriving at London 12 minutes early after a 10 minuite late start from York implies that the padding is good.
 
Status
Not open for further replies.

Top