eMeS
Member
My local paper has just done a piece about a visit from the Transport Secretary to Milton Keynes. Link below:-
What caught my eye was this:
My impression was that getting the Oxford to Bedford route established was the first priority, and that getting through to Cambridge was perhaps a decade away. Am I wrong?
http://www.miltonkeynes.co.uk/news/...ight-for-transport-in-milton-keynes-1-6446346
What caught my eye was this:
(My emphasis.)By 2019, the East West Rail project will see Milton Keynes linked with Oxford and Cambridge and work is scheduled to regenerate Bletchley after funding was recently secured.
My impression was that getting the Oxford to Bedford route established was the first priority, and that getting through to Cambridge was perhaps a decade away. Am I wrong?
http://www.miltonkeynes.co.uk/news/...ight-for-transport-in-milton-keynes-1-6446346