Vanmanyo
Member
So I believe it's been more or less confirmed that Chiltern will operate the first stage of EWR from Oxford to Milton Keynes, but what is the plan for when the full route opens and what stock will be used?
I'm not massively knowledgeable on the whole operating system of EWR. But will it be its own TOC or will it just be Chiltern operating the whole route to Cambridge? Or will it be split between maybe Chiltern, Cross Country or Greater Anglia? And what stock is being used? Purpose built stock, brand new maybe class 196s or just an existing fleet of TOC stock (such as Chiltern using the 165s when the route first opens, but there already isn't enough stock on the CML so this can't be a possibility surely?). Anyone with confirmed or unconfirmed answers; I would love to hear what you have to say!
I'm not massively knowledgeable on the whole operating system of EWR. But will it be its own TOC or will it just be Chiltern operating the whole route to Cambridge? Or will it be split between maybe Chiltern, Cross Country or Greater Anglia? And what stock is being used? Purpose built stock, brand new maybe class 196s or just an existing fleet of TOC stock (such as Chiltern using the 165s when the route first opens, but there already isn't enough stock on the CML so this can't be a possibility surely?). Anyone with confirmed or unconfirmed answers; I would love to hear what you have to say!