The London Road crossing is now going to be replaced by a bridge - not surprising given it would have been shut for 40 minutes every hour once both routes are operating. The Government is giving Oxfordshire County Council money to pay for it. I'd expect all those mentioned east of Bicester will also go, given the policy to eliminate as many level crossings as possible.
http://www.bicesteradvertiser.net/n...ncil_gets_money_for_bridge_at_level_crossing/
And further to the story linked to above, East West Rail's news post says they are also going to be working on the section between Bicester and Claydon.
http://www.eastwestrail.org.uk/news/vegetation-clearance-work-start-onmothballed-railway-line
Interesting. It's a pity the Government didn't decide earlier that they were going to provide additional funding for a bridge, i.e. at the time Chiltern's TWAO for Evergreen 3 was being considered. By the way, I'd challenge the closed-for-40-minutes-per-hour assertion post EWR. It might be correct if the station wasn't going to be rebuilt with staggered platforms. But staggered platforms will allow a train from Oxford to stop at the station and the crossing remain open to minimise delay. I can't imagine having to wait 5 minutes for each train (there will be 8tph post EWR
unless there are going to be many more trains we don't yet know about?).
Either way it doesn't alter the fact that due to the constrained site, it is going to be difficult (= expensive) to put in a bridge on the current London Road alignment. It will need some fairly extensive earthworks to accommodate ramps at an acceptable gradient on a site constrained by residential properties and a petrol station to the east and a brand new station to the west.
At Bicester Town, vegetation clearance has already begun on the south side in the area which will become a secondary entrance to the station. If you are going to put in a bridge you might have designed the station differently - probably not with staggered platforms and maybe not with a secondary station entrance on the south side (if I remember rightly there will be a turning circle and some parking), possibly just pedestrian access would suffice.
IMHO a bridge would be desirable, but not practicable on the current London Road alignment. And ideally you would want a new bridge complete by the time the new station opens and train services resume in 2015. Just can't see it happening - unless you close the road and railway asap. I guess the road has to remain open but also bear in mind that rail access to the MOD over the crossing has to remain for the most part after the rest of the route to Oxford is closed, one of the reasons building of the Bicester chord is already well under way.
Maybe it needs a completely new road - which probably has to go over the new station (and needing bigger/longer ramps etc) though I can't visualise where I'd put that road, not without demolishing buildings.