They will absolutely regret the decision to descope the bi-di and loops between Bicester and Bletchley.
Why? The only loop was at Newton Longville towards Bletchley and bi-di never survives. They both went very early on.They will absolutely regret the decision to descope the bi-di and loops between Bicester and Bletchley.
800m + and they are a loop with a reception loop off that, both NR. You can run round on there off the main line if something ever needs to get to Calvert from Oxford.Because there is no contingency for when things go wrong! You’re a planner, I’m a controller who likes these bits of flexibility to get out of the s**t.
== Doublepost prevention - post automatically merged: ==
@The Planner, here’s a question for you. The Claydon loops, how long will they be and will they be able to be used for regulating purposes, or will they solely act as receptions?
No bi di or even Simbids does seem quite a shame as Claydon would have given you two quite nice sections to keep the service running in the event of breakdown or track failure.Why? The only loop was at Newton Longville towards Bletchley and bi-di never survives. They both went very early on.
Thank you. So theoretically, one of the longest liners could go away there in times of strife. It’s a shame they’re not providing a Limit of Shunt on the Bicester side of the Up Bletchley at Claydon which would allow for a main line run round if the loop was occupied.800m + and they are a loop with a reception loop off that, both NR. You can run round on there off the main line if something ever needs to get to Calvert from Oxford.
Most days there are people bashing and banging in there so something is going on!I made a tour of some of the EWR works today. The Bletchley High Level station has looked the same for months.
I made a tour of some of the EWR works today. The Bletchley High Level station has looked the same for months.
Ist overbridge - Whaddon Road: a second pair of rails has been delivered to site (pics 1347-9 )
2nd overbridge - Swans Way: a second pair of rails has been delivered to site (pics 1350-1) The finished track appears to end under the next footbridge.
3rd overbridge - Mursley Road: underlay laid with a pair of rails positioned on top. (pics 1352-3)
Swanbourne Station site: the underlay and rails laid as far as here. (pic 1354-5)
Winslow Station: no trackwork yet. (pic 1356)
2/2 NEWSFLASH @eastwestrail & @SirPeterHendy!
Track now laid to Swanbourne station site over 5 miles east of Bletchley
New Track Construction Train on the case!
Rugby ROC and Bletchley.Any idea which signalling centre, and traincrew base will work / operate the railway ?
Rugby ROC and Bletchley.
NTC stands for New Track Construction machine - is that so?Incredibly, the NTC has since returned and the rails, and sleepers, have been laid today. Track now runs to Swanbourne.
It does indeed. A highly impressive piece of kit that, produced by Harsco and operated by Balfour Beatty.NTC stands for New Track Construction machine - is that so?
NTC stands for New Track Construction machine - is that so?
It does indeed. A highly impressive piece of kit that, produced by Harsco and operated by Balfour Beatty.
That tweet claims Swanbourne is 5 miles east of Bletchley...Incredibly, the NTC has since returned and the rails, and sleepers, have been laid today. Track now runs to Swanbourne.
Ahyes indeed - a great piece of kit.
I was in attendance when it laid its first sleeper in anger. It then promptly failed.
I was watching it from a few bridges along the A to B project (Airdrie Bathgate) a few years ago
There’s a post somewhere with the overall track laying plan, I’ll try and find it.Ah
I was watching it from a few bridges along the A to B project (Airdrie Bathgate) a few years ago, fascinating to see how quickly the line can be laid (or relaid) when the NTC is around.
Fingers crossed the trackbed through Winslow to Claydon and Calvert isn’t too far away from completion. Then presumably it’s either the second track or the Bicester end to Calvert?
Its been around, they have two, for 15 years plus and must have laid/relaid more than a thousand miles by now. It can relay 250 to 300yds an hour and its main constraint was running out of sleepers but NR's wagons for the HO trains will work with it so on job like this you just pull off the empties and propel another full set back in.yes indeed - a great piece of kit.
I was in attendance when it laid its first sleeper in anger. It then promptly failed.
Does anyone have a ballpark figure for the number of sleepers the normal set of BB wagons can hold? I assume concrete and steel capacities will probably be completely different?Its been around, they have two, for 15 years plus and must have laid/relaid more than a thousand miles by now. It can relay 250 to 300yds an hour and its main constraint was running out of sleepers but NR's wagons for the HO trains will work with it so on job like this you just pull off the empties and propel another full set back in.
Not sure how much has been installed, but you could have wagons waiting on the Fenny Stratford line, bring the empties off towards MKC and then propel the next set in. The whole area from Denbigh Hall South Jn is a possession worksite.I guess in the general case for renewals elsewhere the trick is minimising the length of single track behind the machine - in this case it will still be quite a distance behind it before they can swap over the empty and full sleeper delivery sets, either at the first crossover in western Bletchley or in the vicinity of the high level station?
Does anyone have a ballpark figure for the number of sleepers the normal set of BB wagons can hold? I assume concrete and steel capacities will probably be completely different?
I am not sure the connection from the Marston Vale line is available. Pretty sure it has a stop block chained to the track. I think the only entry/exit point is Denbigh.Not sure how much has been installed, but you could have wagons waiting on the Fenny Stratford line, bring the empties off towards MKC and then propel the next set in. The whole area from Denbigh Hall South Jn is a possession worksite.
Given the line isn't open yet, having long runs shunting the wagons probably isn't too bad a constraint to plan around, unlike when taking possession of a live line.
Is that about 120m per wagon at typical spacing then, so a pretty good length per full trainload?typically 180 per wagon for concrete. (3 layers of 60). We did look at 4 layers but think there were issues with the gantries that move the sleepers around.
the issue is having enough wagons in the circuit between machine, stablin / holding area for replenishment, a.
Is that about 120m per wagon at typical spacing then, so a pretty good length per full trainload?
But, presumably the gantry is constrained by the ever increasing time taken to run down the train and back. Is it possible that I’ve seen a second gantry in use on the NR high output system?
Standard practice to lay the sleepers on the ballast then run ballast for the tamper to work with. They could have significant issues with losing the alignment during next weeks hot weather mind you with ballast that low but im sure the track contractor will ensure the rails are splayed at ferquent intervals where the tarck isn't fully ballasted and stressed.Today I had a look at the Bletchley-Winslow works en route for Claydon House. At the first overbridge (Whaddon Road) I saw completed tracks extending in both directions. (pics 1358,9) Wow.
At the second overbridge (Swan's Way) there was one track, with train on it in the far distance to the West. (pic 1360)
At the third overbridge there was one track, with ballast train parked not far off to the east. (pic 1362)
At the former Swanbourne station there was one finished track running westward under the footbridge and out of sight. Also a new Works sign by a gate in the fence. (pics 1363,4,5)
To my inexpert eye, a lot of the newly laid track looks as though it is awaiting more ballast. (pic 1364).
At Winslow, no track. Just past Winslow was a road closure with a bridge getting some serious attention from EWR. I sighted other works en route to Claydon House via Verney Junction but did not stop.