If Modern Railways are correct in explaining the track from the landfill to EWR is not guaranteed, (known as the Aylesbury link, but really an offline replacement of the original chord), and the revised layout in the IMD presentation, (post #323), is correct in explaining that the south to east access to the IMD and its overbridge have been removed from the scheme, then are they unnecessarily building earthworks for a chord, as seen in the video?
I‘ve annotated a drawing of the what was originally planned below:
I‘ve annotated a drawing of the what was originally planned below: