As I thought. Testing of the route is over and done with.

Is it worth changing the thread title to reflect imminent (fingers crossed) driver training ?.

As you say, the route is complete, commissioned and open for traffic. Driver training has already commenced with several drivers having successfully signed the route.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,745
Location
Croydon
As you say, the route is complete, commissioned and open for traffic. Driver training has already commenced with several drivers having successfully signed the route.
Good news there. Getting tantalisingly close to service.

Are the drivers who have successfully signed the route also passed for 196s ?.
Or so far passed (I presume) on the 165s, hence the visits to Birmingham ?.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
Good news there. Getting tantalisingly close to service.

Are the drivers who have successfully signed the route also passed for 196s ?.
Or so far passed (I presume) on the 165s, hence the visits to Birmingham ?.

Training on 196s has started, as of today nobody has yet signed 196s. All Chiltern drivers sign 165s (and 168s) as that is core traction.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,939
Location
Fenny Stratford
Good news there. Getting tantalisingly close to service.
There is a class 33 hauled charter scheduled for February 15th (?) which should be the first paying passenger service along the line: https://www.pathfindertours.co.uk/events/the-verney-venturer/

A RAILTOUR TO THE REBUILT ‘EAST WEST RAIL LINK’ FROM BLETCHLEY TO BICESTER FOR THE FIRST TIME SINCE THE 1990s ALSO FEATURING CLASS 33 CROMPTONS ON THE MIDLAND MAIN LINE AND CHILTERN LINE – AND MORE​

 
Last edited:

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,728
Location
2 miles and 50 years away from the Longmoor Milita

TheHSRailFan

Member
Joined
16 Jun 2018
Messages
299
There is a class 33 hauled charter scheduled for February 15th (?) which should be the first paying passenger service along the line: https://www.pathfindertours.co.uk/events/the-verney-venturer/
by the looks of it over 10 days later, it's certainly going ahead now :D
(that's not to say NR could turn around and say something is wrong, but by the looks of things it's happening!)

However, if you do want to get on now is the time as standard tickets are low!
 

BlueLeanie

On Moderation
Joined
21 Jul 2023
Messages
723
Location
Haddenham
We're only 16 weeks away from the May timetable change.

Is it likely that there will be a passenger service operating from then? If so, does that mean fares should be uploaded and passengers able to buy an Avanti+Connections ticket from Bicester Village in around 4 weeks?
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
We're only 16 weeks away from the May timetable change.

Is it likely that there will be a passenger service operating from then?

Extremely unlikely. Many variables to be addressed before passenger service introduction can even be considered. No contract has yet been signed, for a start.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
809
Location
London
We're only 16 weeks away from the May timetable change.

Is it likely that there will be a passenger service operating from then? If so, does that mean fares should be uploaded and passengers able to buy an Avanti+Connections ticket from Bicester Village in around 4 weeks?
The schedules have been loaded as empty stock workings for the complete timetable period. Movements from depots/sidings exist both for the training schedule that were present for this timetable period and for the complete passenger timetable. It should be straightforward enough to make them passenger schedules once everything is ready and confirmed between May and December if everything is ready.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
The schedules have been loaded as empty stock workings for the complete timetable period. Movements from depots/sidings exist both for the training schedule that were present for this timetable period and for the complete passenger timetable. It should be straightforward enough to make them passenger schedules once everything is ready and confirmed between May and December if everything is ready.

Yes I noticed that. At first thinking blimey there’s lots of early ECS moves to Milton Keynes but when it continued into lunchtime I guessed that was the reason. What an excellent service Bicester Village will have with Oxford.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,743
Location
"Marston Vale mafia"
The schedules have been loaded as empty stock workings for the complete timetable period. Movements from depots/sidings exist both for the training schedule that were present for this timetable period and for the complete passenger timetable. It should be straightforward enough to make them passenger schedules once everything is ready and confirmed between May and December if everything is ready.

Is the definitive complete timetable now in Realtime Trains, then? If so, 2110 weekday last train from Oxford to MKC is incredibly poor for the South East (and will make the line pretty useless for my main intended purpose for it!). Saturday appears to be 2315 which is considerably better, 2232 on Sunday which isn't terrible. Or could some of the weekday late evening ones still be missing from the data?

I note some early morning workings are now in though without which it'd be pretty useless for commuting, too.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
809
Location
London
Is the definitive complete timetable now in Realtime Trains, then? If so, 2110 weekday last train from Oxford to MKC is incredibly poor for the South East (and will make the line pretty useless for my main intended purpose for it!). Saturday appears to be 2315 which is considerably better, 2232 on Sunday which isn't terrible. Or could some of the weekday late evening ones still be missing from the data?

I note some early morning workings are now in though without which it'd be pretty useless for commuting, too.
Not confirmed but all the schedules join up neatly to form complete diagrams as far as I can tell. The 2110 is the last direct train from Oxford to Milton Keynes, the last train Oxford to Bletchley is 2310 similar to the Saturday time. This coincides with when trains at Bletchley on the mainline are pathed to use only the slows.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
The schedules have been loaded as empty stock workings for the complete timetable period. Movements from depots/sidings exist both for the training schedule that were present for this timetable period and for the complete passenger timetable. It should be straightforward enough to make them passenger schedules once everything is ready and confirmed between May and December if everything is ready.

As I've mentioned before, just because there are paths in for the training trains, this does not mean that they will all be used for training and although they reflect the passenger timetable, it also doesn't mean that all those paths will be used when passenger services commence, whenever that is.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,743
Location
"Marston Vale mafia"
Not confirmed but all the schedules join up neatly to form complete diagrams as far as I can tell. The 2110 is the last direct train from Oxford to Milton Keynes, the last train Oxford to Bletchley is 2310 similar to the Saturday time. This coincides with when trains at Bletchley on the mainline are pathed to use only the slows.

Thanks, that makes sense. I was worried for a bit then!
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,041
Location
Surrey
Extremely unlikely. Many variables to be addressed before passenger service introduction can even be considered. No contract has yet been signed, for a start.
So yet again we've spent 100's millions on building this have known full well when it should be available for use yet uncertainty about when a service will start. Thought Labour were going to get a grip or is our new SoS less enthused about rail than the previous 5min wonder.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
So yet again we've spent 100's millions on building this have known full well when it should be available for use yet uncertainty about when a service will start. Thought Labour were going to get a grip or is our new SoS less enthused about rail than the previous 5min wonder.

But it’s quite the norm with station/line openings these days. Both Cambridge South & Beaulieu Park for example give only sometime in 2025 as a guide.
 
Last edited:

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
So yet again we've spent 100's millions on building this have known full well when it should be available for use yet uncertainty about when a service will start. Thought Labour were going to get a grip or is our new SoS less enthused about rail than the previous 5min wonder.

Feel free to contact the SoS, DfT and so on to voice your displeasure.

== Doublepost prevention - post automatically merged: ==

But it’s quite the norm with station/line openings these days. Both Cambridge North & Beaulieu Park for example give only sometime in 2025 as a guide.

Indeed although of course with station openings it's generally known well in advance who'll be running the trains that stop at those stations, the method of operation and so on. Also if those stations are on existing lines, minimal driver training will be required.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
I assume this is meant to be South?

Haha yes. I’ll get my compass out :lol:

== Doublepost prevention - post automatically merged: ==

Talking of Cambridge North, when I stopped there last Thursday it was the first time I have seen the car park full. Bodes well for patronage at the South Station which I have always envisaged being the busier of the two.
 
Joined
13 Jan 2024
Messages
498
Location
Cambridge
But it’s quite the norm with station/line openings these days. Both Cambridge South & Beaulieu Park for example give only sometime in 2025 as a guide.
I think Cambridge South is delayed until January 2026 as Cambridge resignalling is delayed
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
2,442
Talking of Cambridge North, when I stopped there last Thursday it was the first time I have seen the car park full. Bodes well for patronage at the South Station which I have always envisaged being the busier of the two.
I was at a meeting at the Novotel hotel at Cambridge North in September. It was really convenient for me to get there from Ely, but the car park was full at lunch time, so the next one is going to be at the Garden House hotel in the city centre :frown:
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
I was at a meeting at the Novotel hotel at Cambridge North in September. It was really convenient for me to get there from Ely, but the car park was full at lunch time, so the next one is going to be at the Garden House hotel in the city centre :frown:
Do you need to take your car for props etc?
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
2,442
Do you need to take your car for props etc?
I didn't. A colleague might well have done, but he would have arrived earlier in the morning, and its easy enough to unload if you can the park somewhere. Our office is a 20 minute walk away if the car park was full.

There is also a lot of free parking, in the housing estate the other side of the guided busway, but its a couple of miles to drive there.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
I didn't. A colleague might well have done, but he would have arrived earlier in the morning, and its easy enough to unload if you can the park somewhere. Our office is a 20 minute walk away if the car park was full.

There is also a lot of free parking, in the housing estate the other side of the guided busway, but its a couple of miles to drive there.
Okay. I know the area well and just couldn't imagine driving from Ely to Cambridge with such a good train service.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,939
Location
Fenny Stratford
There is a private Paddington > Oxford > Euston charter along E-W on Friday 7th February. Apparently WCRC hauled.

Also a pair of back to back HST worked along the line last week.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,728
Location
2 miles and 50 years away from the Longmoor Milita
There is a private Paddington > Oxford > Euston charter along E-W on Friday 7th February. Apparently WCRC hauled.

Also a pair of back to back HST worked along the line last week.
I can see Monday 3-Feb's 0Z43 path and today's 0Z44 path on RTT. I can't see one for last week, though.
 