Thanks, I see what you mean now!The consultation feedback analysis will normally be dealt with thematically (e.g. ‘trees’, ‘flooding’ and so on) and not by question or group of questions.
Thanks, I see what you mean now!The consultation feedback analysis will normally be dealt with thematically (e.g. ‘trees’, ‘flooding’ and so on) and not by question or group of questions.
Would there not be any sorting by geography then?The consultation feedback analysis will normally be dealt with thematically (e.g. ‘trees’, ‘flooding’ and so on) and not by question or group of questions.
I imagine many submissions will attempt to 'cover all bases' that might support their opposition.Would there not be any sorting by geography then?
Considering that the primary points of contention would seem to be Bicester level crossing, demolition in the Poets area of Bedford and (trying to be diplomatic) "protecting rural Cambridgeshire", it would seem natural that a lot of responses would fit into those categories.
To some extent, yes, but almost all of the feedback will be high level and generic regardless of which geographical area it might putatively relate to.Would there not be any sorting by geography then?
Considering that the primary points of contention would seem to be Bicester level crossing, demolition in the Poets area of Bedford and (trying to be diplomatic) "protecting rural Cambridgeshire", it would seem natural that a lot of responses would fit into those categories.
Thanks again. I find it very illuminating to be able to have a discussion about the mechanics of the consultation.To some extent, yes, but almost all of the feedback will be high level and generic regardless of which geographical area it might putatively relate to.
Bicester level crossing is a good example. From EWR's perspective it is primarily a level crossing issue, whereas from consultation respondents' perspective it is primarily a Bicester issue. The consultation form needs to be set out in a way that works for the respondents, and that means some sort of data transformation to get the responses to fit with the EWR perspective.The same applies to objections to level crossing closures - whether in Bicester or elsewhere - and any other topic you can think of really.
I was very reassured to read this bit. I see the consultations as an iterative process to get to a better design and a less damaging construction. The consultation process for Cambridge South station was a good example of that. I already try to concentrate my consultation responses on issues where I think there are other options that at least might merit some investigation, having studied the technical report which is a very good guide to what has already been considered.every now and again you find a little nugget which can prove decisive. That is actually how the preferred route alignment between Bedford and Cambourne was identified and selected: one very brief comment mentioned in only a small handful of responses
Or perhaps where one option has been preferred over another one, but the reasoning for that decision hasn't properly taken everything into account.issues where I think there are other options that at least might merit some investigation
I don't think there is, probably because there's no real updates at the moment.Is there a separate thread for construction/upgrades of Bletchley to Bedford?
Not to my knowledge, I don't think they've even decided which option to go with yet.If not, has work started already on this section?
I expect Bletchley to Bedford will start sooner than Bedford to Cambridge, largely due to how difficult it will be to get everything approved for the Bedford-Cambridge section.Or will it be upgraded together with the line to Cambridge, i.e. will Bletchley to Cambridge be one big package?
- Connection Stage 1
East West Rail services will run from Oxford to Bletchley/Milton Keynes.- Connection Stage 2
Building on the work completed in Connection Stage 1, East West Rail services will then extend from Oxford to Bedford.- Connection Stage 3
This stage completes the full East West Rail connection, and will see services run from Oxford to Cambridge via Bedford and Bletchley.
Is there a separate thread for construction/upgrades of Bletchley to Bedford? If not, has work started already on this section?
Or will it be upgraded together with the line to Cambridge, i.e. will Bletchley to Cambridge be one big package?
This is the construction thread, it is currently closed since January pending construction restarting:This is the official East West Rail website which should be kept up to date as this project moves forward.
East West Rail | Your area - Marston Vale
East West Rail would help connect people in and around the Marston Vale area with jobs, education and days out.eastwestrail.co.uk
My understanding is that we are still in the consultation stage about possible station closures/amalgamations.
On the Forum the only thread I can find for construction is this one.
From other threads about Bedford I don’t think they have decided anything about fast line platforms at all. @Magdalia posted, (in the thread linked below), that the published EWR technical report only describes the two new dedicated EWR platforms, so I think your question is premature.At what stage in the process will the rebuilding of Bedford Station take place. Will the new platform on the fast lines be built before EWR?
It says little, if anything, not already known, now accompanied by photos!The report on the 2024 non-statuatory consultation was published on Friday: https://eastwestrail.co.uk/news/lat...2024-non-statutory-consultation-update-report
Thanks for this link. I have not seen anything in local media yet.The report on the 2024 non-statuatory consultation was published on Friday: https://eastwestrail.co.uk/news/lat...2024-non-statutory-consultation-update-report
Not surprised by the figure for Comberton and Great Shelford, as that'll presumably have included those from Harston, Hauxton and Haslingfield, some of whom are very vocally opposed to the EWR routing (there are some very prominent "No East - West Rail here" signs sprouting up). The Residents' association for the village links to the petition (asking for plans to be paused until an "independent review" is undertaken - link here) with just under 5,500 signatures. (NB Not saying I'm agreeing with their point of view!).Thanks for this link. I have not seen anything in local media yet.
One interesting feature is table 3 of the appendix, which shows the attendance figures for the consultation events.
The 3 highest attendances were Comberton 539, Great Shelford 537 and Cambourne 469.
At the other extreme Steeple Claydon 114, Tempsford 147 and Cherry Hinton 189 were the lowest.
I expect the scheduling also comes into it - I originally planned to go to the one in Shelford as it was local and early but couldn’t make it so ended up going to the one in Cherry Hinton.Not surprised by the figure for Comberton and Great Shelford, as that'll presumably have included those from Harston, Hauxton and Haslingfield, some of whom are very vocally opposed to the EWR routing (there are some very prominent "No East - West Rail here" signs sprouting up). The Residents' association for the village links to the petition (asking for plans to be paused until an "independent review" is undertaken - link here) with just under 5,500 signatures. (NB Not saying I'm agreeing with their point of view!).
I went to the Comberton one in the evening. The EWR people said I was one of the few positive voices they'd heard all day.Not surprised by the figure for Comberton and Great Shelford, as that'll presumably have included those from Harston, Hauxton and Haslingfield, some of whom are very vocally opposed to the EWR routing (there are some very prominent "No East - West Rail here" signs sprouting up). The Residents' association for the village links to the petition (asking for plans to be paused until an "independent review" is undertaken - link here) with just under 5,500 signatures. (NB Not saying I'm agreeing with their point of view!).
I went to the Comberton one in the evening. The EWR people said I was one of the few positive voices they'd heard all day.
All good so long as they don't spend hundreds of millions on it and are pragmatic instead of caving to Nimbys, and viaducts are usually much cheaper. More concerning is the proposed Chapel Hill tunnel, which has no physical reason to exist and is only proposed due to bats and NIMBYs.A new article in New Civil Engineer "East West Rail says 1.5km tunnel under A428 is ‘right solution’ despite site constraints"
(Link below, first article free then £)
![]()
East West Rail says 1.5km tunnel under A428 is ‘right solution’ despite site constraints | New Civil Engineer
NCE sister title Ground Engineering reported that the 1.5km long cut-and-cover tunnel would pass beneath the A428 and the proposed Bourn Airfieldwww.newcivilengineer.com
The basic point made by EWR's Integration Director is that there isn't really an obvious route from Cambourne to Cambridge to route the line without doing something like this. Plus construction will be disruptive, requiring a temporary diversion of the A428 and other local roads during construction.
Chapel Hill tunnel has a big reason to exist, and the clue is in the name. Chapel Hill is, for Cambridgeshire, a big hill. The triangulation point near the Barrington-Haslingfield road is 61m above sea level, and about 45m above the River Rhee valley below.More concerning is the proposed Chapel Hill tunnel, which has no physical reason to exist and is only proposed due to bats and NIMBYs
Don't disagree but the curious feature of the A505 tunnel is that it is not at the summit level, that is in a cutting!A good local comparison is the A505 Baldock bypass, which is very similar terrain and geology, and also has a tunnel.
The line of the A505 bypass peaks at about 145m altitude, some 200m NE of where it crosses Hatch Lane. Lowering the road into a cutting mans that the road surface is about 140m altitude. At the junction where the bypass rejoins the eastbound A505 the altitude is about 75m, so to avoid an unnecessarily sharp gradient, the tunnel was aligned to provide as gentle a gradient from the top of the hill. The tunnel was actually constructed by 'cut and cover' methods with a gentle profile road level excavated, the tunnel structure built and the terrain backfilled to approximate the hill's natural profile. This meant that the tunnel is actually on a falling gradient from SW to NE, with moderate cutting depth along the whole length.Don't disagree but the curious feature of the A505 tunnel is that it is not at the summit level, that is in a cutting!
The tunnel was actually constructed by 'cut and cover' methods with a gentle profile road level excavated, the tunnel structure built and the terrain backfilled to approximate the hill's natural profile. This meant that the tunnel is actually on a falling gradient from SW to NE, with moderate cutting depth along the whole length.
Universal Destinations & Experiences (UDX) said it raised objections to the latest East West Rail (EWR Co) proposals, warning there are a “number of significant technical flaws” with the submission material which must be addressed.
In planning documents submitted with its application, UDX said EWR Co.’s non-statutory consultation fails to account for the theme park masterplan, despite the proposals being publicly available since April....