Surely newt is happeningnowt is happening.
On a more serious note, vegetation clearance and wildlife moves are a huge part of making this happen and will also reduce issues at the Inquiry.
Surely newt is happeningnowt is happening.
Incidentally, intended services and opening dates for the Western section are at http://www.eastwestrail.org.uk/train-services/
The original idea was that potential EWR services across Oxford would replace existing stopping services south of Oxford, but electrification to Oxford sometime before EWR starts probably ruins that idea now...Will there be the capacity to run more trains between Didcot & Reading, especially at peak hours? Understand why they would want to link into Reading, but surely it would be easier to run to Didcot
The original idea was that potential EWR services across Oxford would replace existing stopping services south of Oxford, but electrification to Oxford sometime before EWR starts probably ruins that idea now...
Why not? The GW electrification teams will need something to do from early 2019 onwards, otherwise they will probably be disbanded and their hard-won expertise will be lost if that's what happens.
Control Period 6 starts on April 1 2019 and Oxford resignalling will be completed next summer, so as long as CP6 funding to complete the delayed bits of GW wiring (Oxford and Bristol area) is finalised and allocated in good time, then it should be possible for wires on Didcot to Oxford to go up long before 2022. Most of the piling work was done a long time ago, so it's really a case of getting steelwork up and wiring strung.
Changing the subject a tad bit, what is the Transport ministers order of priorities on rail at the moment say from 1-5. That would give me (and others) and idea of where EWR sits in the line of priorities. Thank you.
Yep I know, it was a bit ironic - as in, if the teams had nowhere else to go, why not back to the intended next stretch...!
Happy to see work is still in progress on EWR. There is a distinct lack of publicly announced "hard" dates on these things. Its a shame the transport minister never goes public on an actual promised date on when the gaps in the EWR will be filled. When you read something like "work will start in 201*" it gives the impression its very vague and acts as a placeholder more than anything.
Changing the subject a tad bit, what is the Transport ministers order of priorities on rail at the moment say from 1-5. That would give me (and others) and idea of where EWR sits in the line of priorities. Thank you.
And you won't get a firm date for starting work, let alone finishing it, until all the relevant preparations are done. Not least obtaining the necessary planning consents.
And you won't get a firm date for starting work, let alone finishing it, until all the relevant preparations are done. Not least obtaining the necessary planning consents.
Happy to see work is still in progress on EWR. There is a distinct lack of publicly announced "hard" dates on these things.
You could ask Peter Austin, Delivery Director of the new East West Rail Company. He will be addressing the national rail campaigning organisation Railfuture. It is a public meeting in Cambridge at 2pm on Saturday December 2nd, at the Tamburlaine Hotel 100m from Cambridge station.
Thank you bspahh, very interesting. Any mention of four-tracking on approaches to Cambridge "Central"?
Since the Marston Vale already exists I don't see any reason to wait to replace the level crossings and upgrade the stations and track.
Still mentioning a chord linking MK with Bedford (albeit unlikely)
It seems like nothing has been taken off the table with 3 options for the central section (Northern, Southern, central options). Going off at Lidlington seems premature and its rather hilly round there. I bet thats the highest point of the Vale track. Going through Bedford Midland wasn't an option that was chosen, but its mentioned here which is weird. But the central option looks like the option that was chosen and is most likely.
They mentioned the airport I can see this being right as Cambridge airport is in the north east of Cambridge!
The Arc between Oxford and Cambridge is a high tech high wage job and population gorowth zone. It is also the favoured arc for new housing.
Reading the Oxford Cambridge expressway routing option's it's clear that they want both the new motorway and rail line to be close to each other to maximise development. The rail is to act a means for fast city to city centre links, while the road is to access the outskirts of same towns for business parks, freight and suburban housing.
The costs of both will be more than £2 billion each. But they intend to get their tax money back through housebuilding and job growth. Milton Keynes is expected to be the key hub with population pushed towards 500,000 and plenty of other new towns on a scale not seen since the 1960's.
Talk of hundreds of thousands stretching from Bletchly to Buckingham and Bicester. Looking at a realingnment of the East Coastline at Sandy , for a major expansion of that town as well.
So if this is to be primarily a frequent-stop commuter railway, does that not make the lack of plans to electrify even more bizarre? Or is this all a token effort designed to appease people who will be up in arms about the amount of money going on the 'expressway'?