Is there potential for the E-W to operate between Winslow and Oxford in the first instance as part of a staged opening?
Is there potential for the E-W to operate between Winslow and Oxford in the first instance as part of a staged opening?
Many of us have said previously that sections of the Spine will get quietly dropped. It has never been funded.
I can't see anything being dropped, far easier just to push more into CP6 as we've already seen with the Bedford-Bletchley upgrade.
Chris
I can't see anything being dropped, far easier just to push more into CP6 as we've already seen with the Bedford-Bletchley upgrade.
Chris
Is that new bridge only capable of taking single track? I realise the initial plan is only for a single track reopening but that's a bit short sighted if future traffic increases require redoubling between Aylesbury and Claydon.
It will get to the point where we wont be able to deliver the CP6 work if we keep deferring from CP5. I still don't believe the Spine will come to fruition in the extent it was originally proposed.
With Lib Dems being anti-roads and pro bus regulation and the Tories the other way round, I wonder if the only thing the Coalition agreed on in transport was rail electrification. So when good news was called for they just announced another one of those.
A work compound has been set up at Virney Junction to enable exploratory work along the trackbed to be carried out by contractors.When the work has finished the compound will close and move to another location.
Travelled in the area yesterday - a few photos here
Noticed the presence of new trespass warning signs at some locations
It always seemed to me that this "Electric Freight Spine" was more the product of the enthusiasm of someone at the Department for Transport rather than to meet any perceived need by, or demand from, the freight operators who might be expected to benefit.
Not entirely unlike a recent procurement exercise for Inter-City trains, you could say.
It always seemed to me that this "Electric Freight Spine" was more the product of the enthusiasm of someone at the Department for Transport rather than to meet any perceived need by, or demand from, the freight operators who might be expected to benefit.
Not entirely unlike a recent procurement exercise for Inter-City trains, you could say.
The problem you have is persuading the FOCs to invest in electrics, I suspect DB and FL aren't quite as willing to go for it like DRS have with 68s and 88s. GBRf do have a bit of a point though as the F2N scheme has never really delivered.
But if East West is wired up by 2019, offering the possibility of 92s running all the way to Southampton from Glasgow, Manchester and Birmingham on 25kv and 750v - assuming SWML power supplies are up to the job - then a changeover may start to happen.
This is already possible via South West Lines to London thence the West London Line then WCML from Willesden.
This is already possible via South West Lines to London thence the West London Line then WCML from Willesden.
It isn't gauge cleared to W10 though, so the route isn't a practical alternative even if paths were possible; the canal aqueduct at Farnborough is not going to be easy to clear.
Southampton trains leave the WCML at Basingstoke then the normal route is via the triangle west of Reading to Didcot, Oxford and Leamington. During the landslip they are running through Reading station and transferring from the GWML to the WCML in the Acton/Willesden area. When Crossrail starts running this diversion is likely to become much more difficult, and the WCML isn't exactly empty either especially in the suburban area, so East West will provide a useful alternative to the Leamington route in the future.
I was referring only to the point that the SWML route east of Basingstoke to the WLL via Farnborough, then the Byfleet Curve and Kew etc is not W10, which is why that route isn't such a freight artery as Class 170101 might have been suggesting.
Fairly sure a 92 can't run on the SWML due to either insufficient power supply or signalling interference or both. Either would be very expensive to resolve.