Freight could presumably go via Peterborough and Stamford - the extra distance/journey time isn't so important, and that's already a well-established route.I think there would be clearance problems with A405 bridge
With reversals how are you going to handle freight
Still don't think there's any need to go into Hitchin at all. Just because you're putting a junction north of there, doesn't follow it has to be included. Much more complex layout, service reliability risk of the reversal, for very little gain
Indeed. The only benefit would be for interchange with fast services, of which none now stop at Hitchin as they all now stop at Stevenage New station instead.
The only way a stop at Hitchin would be viable would be if EWR runs south to the Hertford Loop from Bedford (and perhaps onwards to Stansted via Harlow), or if they chose the route via Luton and approach Stevenage from the south.
Clearly reversing at Hitchin would provide a new direct link between Bedford and Hitchin and could also provide strengthened local services between Sandy and Hitchin, linking those places en route to Letchworth and on to Cambridge. Interchange with ECML express services might be better acheived by a separate EWR service leg stretching north to Peterborough, either via the Midland main line north from Bedford then over the Corby line and Stamford, or using additional west - north chord connections at Sandy.
I think there would be clearance problems with A405 bridge
With reversals how are you going to handle freight
I like the pragmatism of your idea Mark (I usually do) and it seems more likely to get off the ground quickly. Long term, there could be a more direct connection from Bedford to Cambridge but this (your diagram posted earlier) provides the earliest implementation.
If I were the campaign group of Rail Future, I would go for that solution (and the Manton Junction chord reinstatement).
Yes, I did a recce of the long curve reinstatement and there is a problem at Luffenham. There is a gap there but the new developments won't like it so near them.Thanks for the compliment Howard. I'm not convinced there ever was a Corby-Stamford chord at Manton Junction, although Google Earth suggests it could be possible to insert a short, approximately level, 200 metre radius double track example there traversing only farmland on an embankment and crossing no roads. The very similar Allington Junction chord scheme near Grantham acheived 40 MPH linespeed from such a construction and cost around £12 million I believe. A longer curve on a gradient following the contour of the hill below the village of Wing might give higher line speed using a larger radius. Reinstating a 5km route from Luffenham on the Stamford line through Morcott to a new junction just north of Harringworth viaduct on the Corby line could save around 7km (5 minutes journey time?) but blocked trackbed in places would indicate expensive and politically difficult diversions and land acquisition.
So, the trackwork here seems to bring up a few issues. You seem to have taken out the Down Fast - Up Slow junction, used to get the Cambridge Expresses from the ECML to the Cambridge Line. I assume this means you're putting them all through the flyover. If nothing else I'd say it'd be useful to keep in as a diversionary route, if not that it's a good way of not having fasts/slows in each others' way. Also, in your plan, every train from Peterborough/Bedford to Bedford has to cross the entire ECML to get back (assuming there's a Down Fast - Down Slow junction somewhere between Hitchin and Sandy). It's fine for Bedford - Hitchin - Cambridge and the appropriate reverse procedure, but you're taking out what could be a useful junction/turning point.
Apologies, just checked and there is a DF-DS crossover at Sandy. I'm still not convinced that a reversal is a wise option though, especially if it pushes freight off the route and through other bottlenecks (Bedford station, Kettering, Peterborough).Putting the whole Down Cambridge service over the flyover, then trying to fit anything for the 'E-W bay' (the only reversal option, excepting the Down Slow platform, for anything heading west) in the opposite direction sounds like rather a performance risk, if indeed it can even be made to work on paper.
So, the trackwork here seems to bring up a few issues. You seem to have taken out the Down Fast - Up Slow junction, used to get the Cambridge Expresses from the ECML to the Cambridge Line. I assume this means you're putting them all through the flyover.If nothing else I'd say it'd be useful to keep in as a diversionary route, if not that it's a good way of not having fasts/slows in each others' way.
Also, in your plan, every train from Peterborough/Bedford to Bedford has to cross the entire ECML to get back (assuming there's a Down Fast - Down Slow junction somewhere between Hitchin and Sandy).
It's fine for Bedford - Hitchin - Cambridge and the appropriate reverse procedure, but you're taking out what could be a useful junction/turning point.
The flyover that's recently been built cannot be doubled.
I meant duplicated, but this point has nothing to do with MarkyT's suggestion, just the increase in capacity, so I ought not to have introduced it, although one OP doubted whether a bidirectional flyover line was sufficient capacity for both E/W and N/S to Cambridge / London.
See Mark's answers above to other points.