Can't they just unscrew the cams and re-assemble it somewhere else? Or have they lost the Allen key?and if it nibbles the IKEA collection point there will be hell to pay from a swathe of Herts Beds and Bucks furniture customers!![]()
This is the H6 bridge, if I've got my geography right. There is an entire unused span that could take at least two extra tracks. Some other bridges may need widening, but surely not this one?
View attachment 109636
Nothing's insurmountable, but everything has a price, and that price will need to be paid by the rail project. the curve will already need 2 junctions, some major earthworks, and additional capacity at MK. All for a handful of freights and the MK-Bedford-Cambridge travel corridor, which won't ever be the world's busiest.The extra tracks would need to go on the other side unless you moved everything over.
It isn't insurmountable, though, and even extended road closures in MK are not a great issue because there are so many diversionary routes.
Nothing's insurmountable, but everything has a price, and that price will need to be paid by the rail project. the curve will already need 2 junctions, some major earthworks, and additional capacity at MK. All for a handful of freights and the MK-Bedford-Cambridge travel corridor, which won't ever be the world's busiest.
Can't they just unscrew the cams and re-assemble it somewhere else? Or have they lost the Allen key?
Exactly, which is why it's made compromises to get the line built.To be fair the whole of EWR fits that description. It won't be empty, but it will only ever be a secondary regional line with relatively short trains.
Deadpool : How's the Kullen coming along? Ikea doesn't assemble itself, you know.I believe the instructions were thrown away some time ago, and the warehouse was built using an ancestor of the BILLY system, so no one knows how to do it.
Exactly, which is why it's made compromises to get the line built.
I told you stewartby brickworks would be handy as a stabling facility and TMD.Bear in mind EWR are initially planned to stable where the curve leaves the Bletchley Bedford line....
Do you really need 1000m radius for a reduced speed curve, lets say 40mph max for simplicity.I would suggest you would want a track distance of at least 1000m (and probably more) if you are planning to run freight as I very much doubt the freight slots for EWR and the WCML slows will match up such that you just cross from one to the other and so they will have to wait on the east to north curve.
I think with the right connections ,the line does have the potential for significantly greater patronage.It is of critical importance to get the point to point connections to the main commercial and transport hubs on the route, of which Bletchley is not.To be fair the whole of EWR fits that description. It won't be empty, but it will only ever be a secondary regional line with relatively short trains.
It has, but given the importance of MK in the whole thing, I think no direct service to MKC from the Cambridge side will just be throwing away revenue, possibly to the point of rendering building that side not worth it at all.
I will personally benefit from it being as it is currently planned, but the line and region will not benefit as much without direct service to MKC.
Not sure what you mean. Isn't there already six platforms at MKC to accommodate a six track railway? And there is a strip of land between the railway and the A5 which looks to my eye to be designed to allow future expansion.
View attachment 109629



I do agree with you that the disruption in MK would barely be noticed because of the grid system.
I think the 1000m was the length between the junctions either end of the curve, not the radius of the curve itself. Similar to the Bacon Factory Curve in Ipswich, this would allow a train to wait for a path onwards, without blocking other trains behind it that are going into Bletchley station.Do you really need 1000m radius for a reduced speed curve, lets say 40mph max for simplicity.
The curve wouldn't be meant for an intermodal going full pelt.
The whole point of the link would be to provide the connection,which is much much needed.
I suppose the closest comparison to come up with would be an allington curve style structure.
That area is going for houses irc. We may get a couple of loops down that way if we are lucky.I told you stewartby brickworks would be handy as a stabling facility and TMD.
Not just for EWR but for MML as well
I think the 1000m was the length between the junctions either end of the curve, not the radius of the curve itself. Similar to the Bacon Factory Curve in Ipswich, this would allow a train to wait for a path onwards, without blocking other trains behind it that are going into Bletchley station.
However, and entirely theoretically as none of this is likely to happen, I imagine a long loop somewhere in open county on the eastern approaches to Bletchley would do the job nearly as well for westbound trains off EWR, so they could be recessed until a path was available round the curve and onto the WCML. A loop in the same place for eastbound would be somewhat less satisfactory as trains from WCML onto EWR would have to have a path as far as that loop, but might still be good enough.
holds true for much of the land along the vale full stop. How much of it comes off is an unknown!I believe much of the land between Bow Brickhill and Woburn Sands has already been earmarked for development.
My family have used the Marston Vale line mostly to reach MkC. Direct trains from Bedford would be ideal but a changeover that gets you there in 30 mins is a good option as well.
Love it. The "importance" of MK to the whole scheme. What utter BS.
Let's deal with some basic facts - and maybe even travel patterns. There is, reasonably, a desire to link Cambridge and Oxford the argument being the research industry and the exchange of ideas.
So now let's take a look at the centre of MK, who the major employers are there and how that fits - you've got CMK shopping centre, so you can discount that, MK Council - again can be discounted. Network Rail - nope, their other sites are London, Derby etc. BP, Santander, Sainsburys Argos - not sure any of those are ticking the box.
No doubt EWR improves connectivity between MK and the Thames Valley - for which there has long been a demand and is quite weak. But is there and has there ever been a similar demand for eastward connectivity to Bedford or Cambridge ? Nope. Not at all.
So lets stop playing the emotional card and start dealing in facts.
OK - lets deal with this step by step.
MK station - the only possible expansion would be on the west side i.e. between the station and the A5, however, the railway and the A5 are not on the same level - this image from Google Maps gives an idea of the difference and that spare 'gap' is the embankment down to the A5, so you'd need *alot* of earthworks.
The bridge at H7 Chaffron Way is similar to the one above, however once you get south of Chaffron Way the green space between the railway and A5 is designated as Elfield Nature Park:
No idea what the bridge over the railway on H8 Standing Way is like or whether that has a spare span.
But after that you've got the railway crossing the A5 and assuming the "new" lines would be on the west side of the current lines
And if any new lines weren't on the west side you'd basically end up having to realign pretty much the whole of the line between Bletchley and MKC at which point the costs would probably go from the "huge" to the "stratospheric" and all to try to allow a few trains to run from Cambridge to Central MK without the need to reverse at Bletchley....... discuss.
Until a year or so back I drove across MK almost daily for the best part of 18 years and if you think a road closure (particularly of a main grid road) would be "barely noticed" then I think you have a curious definition of "barely noticed" and not one which would be shared by the majority of people.
The problem there is that Bletchley does not have a frequent service to MKC, it's only a few an hour, and you can't really change the timings of things to connect well in both directions or they would have done.
Post HS2 frequencies are supposed to increase which might help. But in reality most people on that sort of journey will say change => drive instead.
That's the emotional one, there. It's a hazy eyed, rose-tinted-glasses view of academics in their robes and mortarboards going back and forth.
They aren't going back and forth on the X5, or in the car, or on the train via London. It's a non-market, really.
EWR is a regional line - to open up employment and leisure travel in something which in time might become a conurbation.
These are all major offices.
The A421 begs to differ. Why was it dualled if there was no such demand?
False. The place to add extra tracks is the east of the line as it would not require crossing the formation. At MKC, there is street level parking under the station footbridge on that side which is wide enough to add at least one more platform. It would require moving a few things round with regard to the multi storey, but there is plenty of space.
It is clearly visible here: https://www.google.com/maps/@52.0341351,-0.7738059,337m/data=!3m1!1e3
To give you an idea, when P1 was the terminal line, it was used for rail replacement buses with a temporary bridge from P1 across the buffer stops.
Again, wrong side.
The issue isn't reversal, it's paths on the slows for them to go to MKC at all. A reversal could be done fairly smoothly if it was also used as a crew changeover with driver and guard waiting ready to take over when one arrived.
I live in MK and drive round it daily. Enough said. There have been some recent closures (V4 and H4) for various works and the overall effect was negligible.
This was already looked at. Answer: difficult and expensive.Diversionary split from MML to EWR happening somwhere just a fraction south of elstow roundabout and joining the present marston vale in between kempston and stewartby.A lot of land seems to be ex quarry, so a diveunder should be doable as long as drainage permits.
Why not?St Johns linkage should not be used, at least not for passenger diagrams.It might be worth retaining as a freight passing loop.
Indeed. Quite an extensive housing development potentially in the offing plus commercial and industrial to the north (nearer the current Kempston Hardwick station).That area is going for houses irc. We may get a couple of loops down that way if we are lucky.
It is though, Phase 2 is dead in the water without Oxford to MK trains, they make up a significant amount of the business case which is why people are panicking about getting the trains there and what else needs to be done to facilitate that.Love it. The "importance" of MK to the whole scheme. What utter BS.
It is though, Phase 2 is dead in the water without Oxford to MK trains, they make up a significant amount of the business case which is why people are panicking about getting the trains there and what else needs to be done to facilitate that.
That said, I'm a bit bemused as to why MK Central is the key - for a good chunk of the industry in MK, Bletchley station is actually better sited. I mentioned the OU upthread, but the same goes for Kingston, Caldecotte, Bleak Hall. Event the hospital is 50/50. And if there were 5 tph between MK and Bletchley (as I think there normally would be) any connection time would be minimal.
But if you're talking people commuting to CMK from the Marston Vale and Bedford, a change means they just use the car or bus. That only wouldn't be the case if it was cross platform, which it can't be, it'll be down, up and back down, quite a faff.
Sorry - I don't accept that a change is the deciding factor (regardless of whether it's cross platform or not).
And whilst it's 20 years old, this document https://www.milton-keynes.gov.uk/assets/attach/11658/MKC-25_REVISED_COMMUTING_PAPER-PE.pdf actually broke down where people travel into MK from.
More people travelled into MK from Northampton, Aylesbury Vale, and South Beds than Bedford. In fact Bedford was only fractionally above Mid Beds - bearing in mind Mid Beds covered a load of villages between Luton and Bedford and the only towns in Mid Beds were Biggleswade, Sandy and Shefford - the largest of those is Biggleswade at ~ 20,000 shows Bedford connectivity to MK really isn't that important.
As there will be (and has already been) massive housing development along the route, 20 years ago isn't really helpful. 20 years ago the Southern service only half-filled a 4-car unit at busy times, and then they built Imperial Wharf and then Westfield.
No, CMK isn't much help if you work in Kingston. But CMK is a huge regional employment centre.
Everything will call at Milton Keynes after HS2.Platforms yes, but look at the H6 bridge. There isn't room between the Up slow and the Bridge column.
No, there's 6 platforms to accommodate a layover line on each pair of lines on the 4-track section. Platform 5 may be manageable without, but Platform 2 is certainly required.
You're missing that the alignment of the fast lines can't be moved without penalising 125mph running. I'm guessing that even post-HS2 it will want to be kept at 110mph minimum.
I wouldnt say that is a given.Everything will call at Milton Keynes after HS2.
OK - lets deal with this step by step.
MK station - the only possible expansion would be on the west side i.e. between the station and the A5, however, the railway and the A5 are not on the same level - this image from Google Maps gives an idea of the difference and that spare 'gap' is the embankment down to the A5, so you'd need *alot* of earthworks.
![]()
The bridge at H7 Chaffron Way is similar to the one above,