Interesting - back to the old BR route then.
That's a loss for Grantham - Nottingham, but at least means less pressure on the ECML north of Peterborough (a 90mph DMU can't be easy to path there).
Shame - this feels a bit like the "new" Northern franchise, with the riches showered on the fringe services and little benefit to the "core". No improvement on InterCity services, but lots more services from Lincoln to Doncaster (where an irregular 153 generally seems to cope).
Sunday services on the InterCity services are a bit "cosy" and a bit slow... but no end in sight.
This is not that unusual. Mauldeth Road is the second busiest station on the line between Manchester and Manchester Airport, but it receives the worst service as a result of the recent downgrade. East Didsbury gets a better specification but has many fewer passengers.The specifications for service frequency bear no relation to the ORR's estimates of station usage (apparently the ~300,000 passengers per year at EMD need the same level of service as the ~1,300,000 at LBO and that's less than what the ~1,000,000 at Kettering apparently need).
Interesting - back to the old BR route then.
That's a loss for Grantham - Nottingham, but at least means less pressure on the ECML north of Peterborough (a 90mph DMU can't be easy to path there).
Nottingham to Norwich isn't going via Melton Mowbray. Except the 2 morning services 0 trains per hour are specified all day.
BR introduced one LHCS Yarmouth-Liverpool & return train per day in 1985 but went via Grantham. Even after the full Sprinter timetable was introduced in 88 only a handful took the Melton Mowbray route. 90mph units have very limited impact on the ECML as four tracked here for most of the journey.
There appear to be hourly services specified on the Lincoln to Peterborough, Doncaster and Grimsby routes from December 2021 which is some good news in what is otherwise a fairly underwhelming ITT: I do think it's a pity the XC 170 routes won't be moving over, which especially with Nottingham to Liverpool transferring away, the controversy over removing Intercity calls in Northants, an aging local fleet and the HST compliance issue don't combine to make it a particularly attractive business proposition really.
Yep there isn’t much to get excited about.
I’d hope that a TOC might see some value in exploring the Derby-Stoke route as a means to add some more interesting services... it’s a ‘cross country’ axis which is very underused. Even just extending the Norwich-Nottingham to Crewe might be appealing for some. Adds Derby and Stoke and easy Liverpool and Manchester connections at Stoke and Crewe, plus many others including Chester/North Wales. It could supplement the local service and run two hourly, perhaps.
But does that mean the existing Lincoln - Leicester stopper is cut back to Nottingham?
The TSR is the minimum requirement. They could still meet it (if they can demonstrate a Business Case etc.) by diverting the Norwich-Nottingham via Melton Mowbray (which could generate revenue by serving Loughborough, connections to Derby, etc.), then adding a new Grantham-Nottingham to maintain the Grantham TSR (which is the only station bypassed in most hours as a result)
The guards really don't help themselves on the midland mainline. More often than not they don't leave first class any point north of Leicester.
DOO with on board staff who were actually visible and trained in even the very basics would be an improvement on the current situation in the majority of cases.
Seems to confirm that they'll be little to no investment into the local side which is where the money is actually needed so it looks like a disappointing ITT overall.
The crossing move out of Grantham and the bit of two track out of Stoke Tunnel are pretty capacity-hungry and more and mor saturated these days.
DOO wouldn't fix that. Proper provision of the correct number of on board hosts so the train manager isn't cooking meals and doing the washing up probably would.
Although a West Midlands Train service going down to Stansted would be a bit strange.I have always felt that the WM franchise would be a better fit.
That would leave Birmingham-Nottingham with 1TPH which is inadequate for two cities of that size and reasonably close together. Matlock-Birmingham was tried in 2002 (?) and didn't work.Interestingly yes, this would be an interesting service proposition. Consider the current frequencies (discounting existing through routes):
- 1tph Matlock to Derby
- 1tph Crewe to Derby
- 2tph Birmingham to Derby (non-Voyager)
- 3tph Derby to Nottingham
- 1tph Nottingham to Boston/Skegness
- 1tph Nottingham to Norwich
- 1tph Nottingham to Newark Castle 'extra'
So by changing the pairings, you could end up with:
- 1tph Matlock to New Street
- 1tph Norwich to Crewe via Nottingham and Derby
- 1tph Boston/Skegness to Derby
- 1tph Newark Castle to New Street
Have a 4 car 222 on the Norwich to Crewe; a 3 car 170 for Matlock to New St and Newark to New St; some unit for a Boston/Skegness to Derby and you're in good shape.
Ollerton could be served by extending the Mansfield Woodhouse terminators.Pre-cursor to Ollerton?
The current situation is that only Birmingham crews work east of Leicester on Stansted services so it makes sense for these services to go to a franchise with an existing depot at New Street (especially as the other depot is at Leicester where neither WM or EMT have any train crew based).Although a West Midlands Train service going down to Stansted would be a bit strange.
They should have given the Nottingham to Cardiff to West Mids (or ATW?), while the BHM - Stansted should have gone to EMT so XC can focus on the core XC route.
5.8.30: So basically, if the new timetable doesn't work out, it's up to the Franchisee to solve the problem.
5.9.4: I note it says "operate in another mode" - not specifically highlighting diesel. Hope they choose Steadler units rather than yet more Hitachi.
5.13.2: I'm sure this was on the West Mids ITT too. Wonder how they're going to impliment it, but it would give Abellio a good advantage.
I guess whatever happens though, the Stagecoach colours will disappear.
The current situation is that only Birmingham crews work east of Leicester on Stansted services so it makes sense for these services to go to a franchise with an existing depot at New Street (especially as the other depot is at Leicester where neither WM or EMT have any train crew based).
When do we find out what services they will operate?
An hourly service between Crewe and Norwich would help to provide better east-west connections, and provide longer distance services from Crewe to the east. One way I think this could be done is by using 2 carriages Class 158 calling at Crewe, Alsager, Kidsgrove, Longport, Stoke-on-Trent, Longton, Blythe Bridge, Uttoxeter, Tutbury & Hatton, Peartree, Derby, Long Eaton, Beeston and Nottingham. At Nottingham, 2 further Class 158 carriages would be attached with the service continuing to call at Grantham, Peterborough, Ely, Thetford and Norwich. This would allow for both local and long distance on one service, and maximising capacity on the sector needing the most capacity.
IIRC in the early 90s track costs were allocated between sectors in pecking order. So if a Provincial train used the fasts to Stoke Summit, there was no access charge, but if they used the slows they paid but the Freight sector went free. So if there was no FL path, going via Melton (where Provincial was the prime user anyway) made sense financially.As a young train announcer in the 90s I recall the 13:00 & 13:53 ex-Norwich being routed via Stamford but only calling at Loughborough before reversing again at Nottingham. Not sure why these two successive trains went that way.
You're unlikely to see an hourly service at Peartree - there is simply no demand for it.
The aspiration in the ITT suggests an additional semi fast service Crewe to Derby and beyond rather than extending the current hourly stopper - there isn't much scope to reduce journey times significantly without missing stations, and I can't see it being popular if the service remains hourly but doesnt stop everywhere.
Any additional trains will take some careful scheduling on the single track section near Alsager, then finding a path on the WCML between Kidsgrove and Stoke.
I've seen general comments about increasing capacity on this route such as page 71 of the ITT:I can't see this suggestion of an additional Crewe service. Can you post it in this quote?
I've seen general comments about increasing capacity on this route such as page 71 of the ITT:
"Bids that preserve, provide new, or enhance existing direct journey opportunities that are important to passengers but are not specified in the TSR, including but not limited to:
i) Maintaining connectivity between non-London locations on the Midland Main Line without adversely affecting journey time improvements for longer-distance flows;
ii) Reinstating peak train services between Wellingborough and Bedford to replace the bus service between these stations as soon as reasonably practicable; and
iii) improving strategic east to west connectivity, which could include enhancements to the Derby – Crewe service to reduce journey times between principal stations and/or extension of this service to destinations beyond Derby."
Any intention of extending the Derby - Crewe service to Manchester Airport? I know that MIA is discussed in another thread but the Potteries is (are) one area without a direct service.You're unlikely to see an hourly service at Peartree - there is simply no demand for it.
The aspiration in the ITT suggests an additional semi fast service Crewe to Derby and beyond rather than extending the current hourly stopper - there isn't much scope to reduce journey times significantly without missing stations, and I can't see it being popular if the service remains hourly but doesnt stop everywhere.
Any additional trains will take some careful scheduling on the single track section near Alsager, then finding a path on the WCML between Kidsgrove and Stoke.
Any intention of extending the Derby - Crewe service to Manchester Airport? I know that MIA is discussed in another thread but the Potteries is (are) one area without a direct service.
That is indeed the section I was referring to - reducing journey times between principal stations is only really possible by removing some stops or introducing additional limited stop services.
It does.Joy be praised, I can't find a thing in the ITT to suggest the DfT is ordering the franchise name to be other than the current one![]()