As many of you will be aware, funding has been secured to plough ahead with the proposed East Leeds Parkway Station. As a West Yorkshire passenger, I have taken quite an interest in this, especially as for trips to York and beyond, I drive to Garforth station and take the train from there.
I have a number of queries and worries however as to the proposals. Is capacity available for the proposed services? Is the planned 1 bay platform and 2 through platforms enough considering the possibility of future expansion? What other services will stop there?
Here is my thinking on the matter. I am led to believe that the proposed terminating services are to be those from the Huddersfield line. If this is so, does this mean that the TransPennine route is therefore earmarked for electrification? What would that mean for the planned introduction of more DMU's at FTPE? I cannot see exactly how the service will be correctly integrated. If the line East of Leeds were electrified, EMU's would have to terminate at Leeds or go on to Airedale/Wharfedale or Doncaster. Services from Huddersfield would still be DMU which makes me wonder why electrification is necessary.
Does anyone have any information on the situation? I am open to speculation! What would be the best way to integrate East Leeds Parkway into the network? I know there are plenty here who like to think up ways of running the service! If there are some cold, hard facts out there, I am very interested to hear them.
Also, would anyone care to choose an alternative location for a Parkway station in West Yorkshire?
The floor is open!
I have a number of queries and worries however as to the proposals. Is capacity available for the proposed services? Is the planned 1 bay platform and 2 through platforms enough considering the possibility of future expansion? What other services will stop there?
Here is my thinking on the matter. I am led to believe that the proposed terminating services are to be those from the Huddersfield line. If this is so, does this mean that the TransPennine route is therefore earmarked for electrification? What would that mean for the planned introduction of more DMU's at FTPE? I cannot see exactly how the service will be correctly integrated. If the line East of Leeds were electrified, EMU's would have to terminate at Leeds or go on to Airedale/Wharfedale or Doncaster. Services from Huddersfield would still be DMU which makes me wonder why electrification is necessary.
Does anyone have any information on the situation? I am open to speculation! What would be the best way to integrate East Leeds Parkway into the network? I know there are plenty here who like to think up ways of running the service! If there are some cold, hard facts out there, I am very interested to hear them.
Also, would anyone care to choose an alternative location for a Parkway station in West Yorkshire?
The floor is open!