I know the East Kilbride single platform was extendeda short way, but then with the new station building, I don't know whether any of that additional length had been eaten into (and it is nowhere near long enough for 8 car trains as mentioned above).

I also think the main thing preventing any increase in services is a lack of capacity around Glasgow Central. I know another platform at EK would enable trains to spend more turnaround time at EK and reduce platform occupancy at Glasgw Central, but I still don't know if this would be enough capacity unlocked to run more services?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SC318250

Member
Joined
4 Jun 2011
Messages
796
Looks like it was 380015/021 that did test runs or 380021 on its own.
Think tonights run might be a 385 as the unit tonight forms the 0705 Gourock in the morning
 

ILikeTrains1

New Member
Joined
1 Mar 2025
Messages
1
Location
Scotland
Scotrail have just put on their social that a class, 380 and 385 ran successfully, does that mean the 385 may also be running the EK services?
 

380101

Member
Joined
18 Feb 2015
Messages
1,137
Scotrail have just put on their social that a class, 380 and 385 ran successfully, does that mean the 385 may also be running the EK services?

The 385 run was purely for route clearance purposes. There is no plan to run 385s in service on the route anytime soon.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
The 385 run was purely for route clearance purposes. There is no plan to run 385s in service on the route anytime soon.
Now that test trains have run, are there formal approvals required before passenger trains can operate?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,282
Location
Glasgow
Now that test trains have run, are there formal approvals required before passenger trains can operate?
If its like Barrhead, there were handling runs as I recall.

Presumably to give driver's hands-on experience of the different acceleration and braking profile and match it to the EK branch.
 

380101

Member
Joined
18 Feb 2015
Messages
1,137
If its like Barrhead, there were handling runs as I recall.

Presumably to give driver's hands-on experience of the different acceleration and braking profile and match it to the EK branch.

There was no "handling runs" carried out on the Barrhead line. All drivers that signed the route (Dumfries and Stranraer exlcuded) signed 380s, so no requirement to do any train handling prior to the 380s taking over from the 156s.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,282
Location
Glasgow
There was no "handling runs" carried out on the Barrhead line. All drivers that signed the route (Dumfries and Stranraer exlcuded) signed 380s, so no requirement to do any train handling prior to the 380s taking over from the 156s.
Apologies, either someone mis-labelled the test runs last time or I've misremembered.

And yes, I was aware all drivers who sign Barrhead/EK also signed 380s already bar Dumfries and Stranraer.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
If its like Barrhead, there were handling runs as I recall.

Presumably to give driver's hands-on experience of the different acceleration and braking profile and match it to the EK branch.
I was thinking more of ORR approvals or the likes.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,492
Location
Moorpark, CA
If its like Barrhead, there were handling runs as I recall.

Presumably to give driver's hands-on experience of the different acceleration and braking profile and match it to the EK branch.
It’ll certainly be a different experience to struggling up the hill in a clapped out 116…..
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
Apologies, either someone mis-labelled the test runs last time or I've misremembered.

And yes, I was aware all drivers who sign Barrhead/EK also signed 380s already bar Dumfries and Stranraer.
From what I "Remember" was 1 night test run/s and A Press/Dignitary Run
 

380101

Member
Joined
18 Feb 2015
Messages
1,137
Scotrail updated their YT channel with a 'first test run for electric trains on EK line' clip,


Looks to be a pair of 385s.

A 6 car 380 was used on the first test runs on the Monday night.

The 6 car 385 was used on the Tuesday night to do a run for route clearance purposes. The NR media team were on that run, hence the video.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,242
I wonder if we will see a 385 at some point, I suppose they are cleared, its an option.
 

380101

Member
Joined
18 Feb 2015
Messages
1,137
I wonder if we will see a 385 at some point, I suppose they are cleared, its an option.

Highly unlikely in the short to medium term, as it would require over 100 drivers at Ayr to be trained on them, ( this equates to 300 training days) and they won't do that when all drivers that have East Kilbride (apart from Dumfries who lose the route in December) sign the 380.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,708
Location
West of Andover
Hairmyres is an interesting station where the Glasgow bound side has barriers but the East Kilbride bound platform is open as the footbridge provides access for non rail users. I guess the theory is passengers will buy tickets to head towards Glasgow (or other stations on the line) so checking tickets on EK bound services isn't needed (and that EK has barriers).

Reminds me of one of the stations between Southend Central & Shoeburyness.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
“Once the timetable change is introduced, around 75 per cent of services between Glasgow Central and East Kilbride will be operated by electric trains, marking a significant step forward in Scotland’s ongoing rail decarbonisation programme.”


I'm sure I read previously that 25% would be electric, this is a major change if so.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,282
Location
Glasgow
“Once the timetable change is introduced, around 75 per cent of services between Glasgow Central and East Kilbride will be operated by electric trains, marking a significant step forward in Scotland’s ongoing rail decarbonisation programme.”


I'm sure I read previously that 25% would be electric, this is a major change if so.
RTT certainly suggested 2 out of 5 diagrams, 75% would suggest 3 out of 5 (possibly just the two peak extras remaining diesel).
 

N1

Member
Joined
10 Aug 2022
Messages
385
RTT certainly suggested 2 out of 5 diagrams, 75% would suggest 3 out of 5 (possibly just the two peak extras remaining diesel).
Or perhaps a slight difference between weekdays and weekends?

The changes to Cathcart Circle seems to be 318/320s covering more diagrams releasing 380s for EK?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,282
Location
Glasgow
Or perhaps a slight difference between weekdays and weekends?
Certainly the balance was more electric on weekends, but there are fewer diagrams then as well.


The changes to Cathcart Circle seems to be 318/320s covering more diagrams releasing 380s for EK?
Probably the only way it can be done without shortforming, as there's basically no spare capacity in the 380 on current diagrams; there is however some capacity in 318/320 diagrams.
 

AMD

Member
Joined
6 Dec 2017
Messages
770
The changes to Cathcart Circle seems to be 318/320s covering more diagrams releasing 380s for EK?
Also the daily requirement for 385s is going up by one, currently 64 required daily, will be 65 from December - this is to release a 380 from a current diagram.
 

SC318250

Member
Joined
4 Jun 2011
Messages
796
Or perhaps a slight difference between weekdays and weekends?

The changes to Cathcart Circle seems to be 318/320s covering more diagrams releasing 380s for EK?
Looks like a 6 car 318/320 coming from Shields to cover a 380/4 diagram, which will go on East Kilbride line.
This 6 car diagram does

Neilston
2 Cathcart Circles
Several Neilstons
1815 Wemyss Bay
Then a Gourock service before returning to Shields
 

sannox

Member
Joined
1 Mar 2016
Messages
649
Looks like a 6 car 318/320 coming from Shields to cover a 380/4 diagram, which will go on East Kilbride line.
This 6 car diagram does

Neilston
2 Cathcart Circles
Several Neilstons
1815 Wemyss Bay
Then a Gourock service before returning to Shields
Suggestion was more carriages on peak time Neilston trains. I presume that 318/320s running as 6 carriage shunts a 4 carriage 380 to EK?
 

sannox

Member
Joined
1 Mar 2016
Messages
649
The original post on this thread from back in 2020 mentions 4tph on the line after electrification. Is this still happening, and if so, when?

Would say it's unlikely give the changes in the interim. The reintroduction of the half hourly evening service (after 7/8pm) is most welcome however.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,282
Location
Glasgow
The original post on this thread from back in 2020 mentions 4tph on the line after electrification. Is this still happening, and if so, when?
The infrastructure can't support it, so definitely not happening any time soon.

(The double tracking was massively down-scoped.)
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,492
Location
Moorpark, CA
The infrastructure can't support it, so definitely not happening any time soon.

(The double tracking was massively down-scoped.)
Correct. I still take the view that the original costing was predicated on “redoubling“: beyond Busby was never double. What now exists is pretty much all that can be reasonably done.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,242
Interesting to see how long the Class 156s stay on the EK branch.

No more 6 car workings once they have gone, I wonder what the shortfall is to a 4 car Class 380.
 