For example on the XC route from Manchester to Bournemouth
I've heard this mentioned a few times in this thread, is this a particularly busy line over say the Newcastle-Reading (plus extensions) routes ?
For example on the XC route from Manchester to Bournemouth
How many could go to GA for services to Norwich, to live out their days before they're replaced with something new?
Obviously the Mk4s won't last as long as a new fleet, but they'll presumably give a bit of breathing space because we can't replace all the ageing stock with new trains overnight.
It would also save the need for any more refresh/upgrade work on the existing Mk3s, which can then be scrapped.
Presuming that a 91 / Mk IV rake accelerate at least as fast as 90 / Mk III?
Which it can't, nothing like.
91s are geared for 140mph. The GE at best will see some marginal raises to 110mph, even then you are unlikely to get full use of that whilst 321s are still wobbling about.
The 91s, as they are, are pretty tired. Even if they stayed they would require a heavy rebuild. Changing the gearing, because of the drive arrangement is difficult and expensive if not impossible. Lease on TRAXX vs a rebuilt 91 is likely to be close....TRAXX has a market across Europe, a rebuilt 91 doesn't.
You'll have gauge clearance work to do for the Mk4s. If, and it is a very big if, LHCS stays on the GE the likely outcome is rebuilt Mk3s and TRAXX.
I'd expect more IEPs to turn up....
I think the electrified MML is the most probable destination, to replace both HSTs and Meridians. How do the numbers work out if both current MML/EMT long distance fleets are involved?
Careful, even suggesting scrapping Mark 3's can get you branded as a heretic by some!!!
Also, IIRC, the electrification of the MML does not provide a fully electric network for all the EMT's IC services...
If you are looking at numbers of sets, it doesn't work 30 IC225 vs 51 sets currently in use.
However if you compare number of coaches (remembering that the 222's don't really have full end coaches) you would be looking at 302 Mark 4's vs 251 coaches currently in service, which means that there would be plenty of coaches left to provide extra capacity. Although that may require extra locos and extra DVT's (unless there are a significant number of existing services running with doubled up 222's).
Also, IIRC, the electrification of the MML does not provide a fully electric network for all the EMT's IC services, so there may be just enough need for diesel stock to remain to cover the need for extra locos (although that could mean that there are a number of Mark 4's sat not doing anything, but possibly not quite enough to be of much use).
As for Corby to Syston Junction via Melton Mowbray, Network Rail has stated that the case is very dependant on the demand for electric freight paths given.
In an election as tight as 2015 is likely to be, and, frankly, 2020 is likely to be too, headline improvements in areas with marginal seats will be increasingly common. Indeed, just look at the recent announcements and the constituency MPs:
- Maidenhead to LHR (£500m) (Theresa May, Maidenhead)
- Electric Spine to Sheffield (Nick Clegg,Sheffield Hallam)
- Northern Hub (Coalition in general, George Osborne, Tatton, in particular)
- Oxford (Marginal Tory/Lib Dem seats)
- Cotswold Line (D Cameron, Whitney)
- GOBLIN electrification (Boris / TfL)
Not that there's a conspiracy, but the prioritisation is interesting
I think the electrified MML is the most probable destination, to replace both HSTs and Meridians. How do the numbers work out if both current MML/EMT long distance fleets are involved?
Cut out the Corby services and the number of doubled up 222s (certainly not uncommon to see them on Sheffield services) and I think you could use thirty 225s to replace 27x222s and around a dozen HSTs (depending on how many East Coast are pinching!).
The HSTs are used fairly sparingly off-peak too. Maybe you could keep a handful on a box-ticker-express from Neville Hill to London via reversal at Nottingham (so that the unelectrified Alfreton route retains some direct service to London) if the numbers aren't perfect.
For me, the question would be whether the "inflexible" 225 lengths are going to cause any problems at smaller stations (Beeston, Long Eaton) - I think that Loughborough is always going to be an issue.
Don't you also need specialist servicing facilities for Class 91/Mk4 which do not exist away from ECML depots?
... I think that Loughborough is always going to be an issue.
Loughborough was lengthened at the north end last year so is no longer a short platform
Didn't they spend big bucks on platform extensions there prior to the Olympics? though? 250 metres or so?
Looking at the numbers and as others have said the IEP seems to be like for like replacement with no room for growth. (I know HS2 will remove some passengers off the ECML but that is 2026 if it happens at all - until the digger hits the ground I will remain cynical as the lobby against it seems very powerful - more powerful than if it was a motorway)
IEP will have 14% more seats in a 9 coach set than the current IC225's (627 seats vs at about 550*). Which does allow for some growth, but only about 5 years worth of 2.5% per year (the same growth rate which HS2 has been based upon).
Of course, there is still the possibility (if there are any spare paths) that a few IC225's could be retained to cater for some of the extra growth or a few more IEP's could be ordered for delivery after any future IEP orders for which ever TOC's would like them (XC, GW's west country services, etc.).
*if I've counted correctly.
I don't know about that, the total number of 9-car sets alone that are now being ordered for the East Coast is largely equivalent to the current fleet size, with 13 x 9-car Bi-mode trains to replace 14/15 HST sets (Working 13 diagrams - Obviously that doesn't quite work out as regards the IEP total) and 30 x 9-car Electric trains to replace 30 x 225 sets (To work 26 diagrams). That means that nearly all the 5-car IEP sets that are being ordered (22 trains or 110 carriages) can be considered as additional capacity.Looking at the numbers and as others have said the IEP seems to be like for like replacement with no room for growth.
Looking at the numbers and as others have said the IEP seems to be like for like replacement with no room for growth
As for the mk4s, people have suggested London - Sheffield and Norwich. But other routes such as London - Cambridge may also be a possible destination - they did look at IEP after-all
It is strange how people are already assuming the IEP will have a worse interior that the mk4s before even a proto-type is out
Hopefully IEP will have a production line that allows the first batch to be built for the GWML and ECML (HST replacement) then for a follow on order for the ECML (225 replacement) then for the GWML (bi-modes for Devon/Cornwall) then maybe it'd be possible to order some more for growth on the first tranches of routes, maybe ordering some all-electric ones to replace some of the first bi-mode ones (which can then be moved to XC) etc etc.
I'm certainly hoping that we'll be able to order more in the future to cope with demand.
If you could resolve the Kings Lynn issue, Kings Cross - Cambridge would be great for 225s.