Easiest Railway Lines to reinstate

Status
Not open for further replies.

RichJF

Established Member
Joined
2 Nov 2012
Messages
1,202
Location
South London
Following on from the thread "hardest railway lines to reinstate", it got me thinking. What are the disused railway lines with the fewest obstacles to reinstate?
Or to open it up a bit more, which disused lines would have large support for reopening.

A suggestion is Bristol-Portishead.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Polarbear

Established Member
Joined
24 May 2008
Messages
1,922
Location
Birkenhead
Logically, any route where the track & infrastructure is still largely intact would seem to qualify.

That said, you wouldn't believe that when considering how long it's taking to get some lines in England reopened, (Newcastle-Ashington being an example). Ok, the stations need building/re-building, but it's not like everything has to be rebuilt.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,400
Location
Yorks
The Brightlingsea branch in Essex must be quite easy. Short with few earthworks or structures to speak of.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Bristol East (MR) to Yate would not be too difficult, mainly getting rid of a bingo hall at Lawrence Hill and some earthworks reinstated north of Mangotsfield. It avoids having to build a grade separated junction at Stoke Gifford in the future, too. Ditto the line from Mangotsfield to Bath.

Really, it's anywhere Sustrans bagged a line's solum for (mainly) leisure cyclists.
 

Muzer

Established Member
Joined
3 Feb 2012
Messages
2,784
Croxley link ;). No engineering obstacles; all political!
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
Track still in place: North Mersey branch. (Trickier if you want to connect to the docks, or to the Kirkby-Wigan line).

Track not still in place: CLC North Liverpool Extension / outer loop. (Trackbed mostly intact, except for the Knotty Ash Sainsburys)
 

lyndhurst25

Established Member
Joined
26 Nov 2010
Messages
1,591
Clayton West branch. You'd just have to kick the Kirklees Light Railway off the trackbed.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Cowley Junction to Garsington Road.

Perhaps to Horspath Halt if shifted West slightly.
 

Doctor Fegg

Established Member
Joined
9 Nov 2010
Messages
2,135
Location
Charlbury
Bristol East (MR) to Yate would not be too difficult, mainly getting rid of a bingo hall at Lawrence Hill and some earthworks reinstated north of Mangotsfield. It avoids having to build a grade separated junction at Stoke Gifford in the future, too. Ditto the line from Mangotsfield to Bath.

Really, it's anywhere Sustrans bagged a line's solum for (mainly) leisure cyclists.

I wouldn't say that the Bristol-Bath Railway Path is mainly leisure cyclists. It's a major commuter route these days - a recent count, carried out in December of all months, showed that over 3,800 people use it every weekday. There are plenty of railway paths which are mostly leisure use, but not that one.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
At Helens Central - Junction would be straightforward and could even be turned into a triangular junction to enable Liverpool bound traffic, which would be only realistic way of getting funding from a Liverpool city region mayor! A St Helens - Manchester service would be extremely useful but politically not something a pro-Liverpool mayor is ever going to agree too, as well as the usual bleating from NR about paths etc
 

DanTrain

Member
Joined
9 Jul 2017
Messages
753
Location
Sheffield
Matlock - Buxton would be fairly easy physically, with much of the old track either cycle path or heritage railway. Politically however...
 

nbdm

Member
Joined
5 Oct 2017
Messages
30
Not sure if this counts, but the Camp Hill line through Birmingham is on a wishlist by local politicians.
Track still in use by freight and cross country non-stop, all the stations are gone however.
Also probably needs a connection to Moor Street as New Street is likely too full.
 

randyrippley

Established Member
Joined
21 Feb 2016
Messages
5,382
The Little North Western between Wennington and Lancaster would be easy- most of the route is a cycletrack and the rest remains clear, though the bridges at Halton might need some work.
Lancaster - Morecambe would be a problem due to Greyhound bridge now carrying road traffic.
Likewise the Ingleton line would be easy: the trackbed is clear and the viaducts remain in place.
Similarly Lancaster Castle- Glasson Dock would be simple: cycletrack all the way at present.

No chance of a business case for any of them though, unless reopening the Ingleton route was used as an excuse to shut the S&C
 

Eastwestjct

Member
Joined
17 Dec 2016
Messages
29
Location
Hampshire
Totton - MarchwoodSignal - Hythe and towards Fawley

Track is all there. Som upgrading required for level crossings for passenger trains.

New station beyond Frost lane as a park and ride would work well
 

IainG81

Member
Joined
19 Mar 2017
Messages
75
Think some of the line between West Drayton and Staines will be if the southern Link to Heathrow is approved probably a tunnel under M25 is needed but much of it is still track bed is there still track does go as far as Colnbrook. Don't think it will be done to West Drayton but i think its one of the easier lines to bring back.
 

apk55

Member
Joined
7 Jul 2011
Messages
446
Location
Altrincham
Sandbach Middlewich Northwich. Track is in place and in service for freight and diverted passenger trains however would probably need some upgrading. Otherwise all that would be involved would be building some platforms and possibly some minor track modifications.
 

USBT

Member
Joined
5 Nov 2017
Messages
121
Surely any heritage railway that is connected to the mainline?

Yup.

East Grinstead to Sheffield Park (Bluebell Railway).

Central line Epping to Ongar.

Also at a stretch (not heritage) Piccadilly line Holborn to Aldwych.
 

JohnElliott

Member
Joined
15 Sep 2014
Messages
275
East Grinstead to Sheffield Park (Bluebell Railway).

Depends what you meant by 'reinstate' -- if you wanted it double track between East Grinstead and Horsted Keynes (as it was under BR), the work required would not be trivial.
 

chorleyjeff

Member
Joined
3 May 2013
Messages
677
The Little North Western between Wennington and Lancaster would be easy- most of the route is a cycletrack and the rest remains clear, though the bridges at Halton might need some work.
Lancaster - Morecambe would be a problem due to Greyhound bridge now carrying road traffic.
Likewise the Ingleton line would be easy: the trackbed is clear and the viaducts remain in place.
Similarly Lancaster Castle- Glasson Dock would be simple: cycletrack all the way at present.

No chance of a business case for any of them though, unless reopening the Ingleton route was used as an excuse to shut the S&C

The business case for the S&C never worked and using the Ingleton line would be a sensible reversion to the original plan.
Keep the ends S&C as freight branches to quarries if needed.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
Ok the track is open already but I wish the two tracks that would reopen are the fast lines on the Wirral between Birkenhead and Hooton. Painfully slow going to/from Chester. Mostly clear and ready to go in. I can wish!
 

TommyD

Member
Joined
26 Oct 2011
Messages
12
As far as I'm aware most of the track is still in situ, albeit rather overgrown, between Stoke-on-Trent and Leek. No station at Leek of course but the CVR is attempting to get one built.
 