Dundee electrification plans

Morayshire

Member
Joined
6 Feb 2019
Messages
299
Delivery times for these are quite lengthy. No doubt the 3 units are in safe storage at Cadder until the Fife Circle or ACB schemes are authorised for installation. Not currently authorised. The other could possibly be for Dundee.

mods note - split from this thread:

Re the text in bold, the Dundee feeder station planning application is in and is now available to view on the Dundee City Council Planning Portal

25/00359/FULN - Construction of a 132kV substation and rail traction transformer station and associated works

Brief summary from the Courier is as follows:

A new feeder station could be built in Dundee as part of a £120m project to electrify Scotland’s rail network.

SSEN Transmission have applied for planning permission to construct and operate a 132 kV GIS substation and 132 kV Network Rail feeder station in the city.

These will deliver power to the newly electrified lines between Dundee to Montrose.

The proposed development is located on land located in the Stannergate area of Dundee in an area “dominated by industrial land use and road and rail connections"
If approved, work will take place over the course of three years. Construction is expected to begin in June 2026.

Construction activities would be undertaken between 7am and 7pm on weekdays and 7am to 1pm on Saturdays.

Link to Courier article - source of text quoted above - Dundee Planning Ahead: Network Rail feeder station proposals
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Re the text in bold, the Dundee feeder station planning application is in and is now available to view on the Dundee City Council Planning Portal

25/00359/FULN - Construction of a 132kV substation and rail traction transformer station and associated works

Brief summary from the Courier is as follows:




Link to Courier article - source of text quoted above - Dundee Planning Ahead: Network Rail feeder station proposals
Magnificent! Glad it's happening so soon, as I expected it to begin around the early 2030s, following the Fife Circle's full electrification. Looking forward to see where the wires will take us next!
 

Morayshire

Member
Joined
6 Feb 2019
Messages
299
It is encouraging that they have put the planning application in. Hopefully the proposed start date of June 2026 doesn't turn out to be too optimistic and that this actually gets through planning without too much hassle.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,589
Location
Scotland
It is encouraging that they have put the planning application in. Hopefully the proposed start date of June 2026 doesn't turn out to be too optimistic and that this actually gets through planning without too much hassle.
Given that the Stannergate area is heavily industrial, I can't see any reasonable person objecting.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,360
Location
belfast
Those will be pretty easy to reject.
While that is likely true, it may still cause delays, especially if the people appeal etc.

Though chances of delay are definitely reduced with the feeder being in an industrial area!
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,589
Location
Scotland
Though chances of delay are definitely reduced with the feeder being in an industrial area!
The exact area outlined on the site plan is currently home to (disused?) storage tanks associated with the old Dundee oil refinery.
 
Last edited:

mcmad

Member
Joined
11 Mar 2015
Messages
1,072
The only potential valid objections would be from the half dozen properties at the eastern end of the site albeit they are elevated above the proposed site there will be a potential increase in noise & RF interference.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,983
Location
Surrey
Re the text in bold, the Dundee feeder station planning application is in and is now available to view on the Dundee City Council Planning Portal

25/00359/FULN - Construction of a 132kV substation and rail traction transformer station and associated works

Brief summary from the Courier is as follows:




Link to Courier article - source of text quoted above - Dundee Planning Ahead: Network Rail feeder station proposals
Quite a size for a feeder station but looks like its all indoor switchgear at 132kV as the grid is cabled in this area.

How many feeder stations are now in play without any timeline for when there will be wiring to feed though. Yes they are essential but personally I would have used the funds to keep the wiring teams occupied as work will dry up shortly once East Kilbride is complete.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
Quite a size for a feeder station but looks like its all indoor switchgear at 132kV as the grid is cabled in this area.

How many feeder stations are now in play without any timeline for when there will be wiring to feed though. Yes they are essential but personally I would have used the funds to keep the wiring teams occupied as work will dry up shortly once East Kilbride is complete.
132/25kV feeder stations are quite large as the DNO will want a switching yard that are quite spread out and then the transformer(s) and a central control room with the necessary switching protection equipment and metering
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,983
Location
Surrey
132/25kV feeder stations are quite large as the DNO will want a switching yard that are quite spread out and then the transformer(s) and a central control room with the necessary switching protection equipment and metering
It's indoor switchgear though so footprint should be smaller.

Anyhow, I guess Scottish Power have acquired the site as bulk of the equipment is theirs. It's a former oil storage site

https://www.cbre.co.uk/resources/fileassets/GB-Plus-512566/d3bfdf4a/DP933 - Nynas Dundee - Brochure V3.pdf
The site for sale comprises a former oil refinery facility, equating to approximately 8.9 acres, with operations being inactive for the last 10 years
 
Last edited by a moderator:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,455
Location
Preston Lancs

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Wow, that is convenient and strategic. I assume a neutral section would need to go in though so I was wondering if a neutral section so close to the station might be an issue?
They could always offset the neutral section from the feeder station's position. It worked for South Wigston!
 

GW43125

Established Member
Joined
8 Dec 2014
Messages
2,310
Wow, that is convenient and strategic. I assume a neutral section would need to go in though so I was wondering if a neutral section so close to the station might be an issue?
A quick play at Google maps suggests the old oil store is about a mile east of the station-Manningtree, Oxenholme, Penrith & Carlisle all have similarly awkward neutral sections from memory.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,455
Location
Preston Lancs
They could always offset the neutral section from the feeder station's position. It worked for South Wigston!
A quick play at Google maps suggests the old oil store is about a mile east of the station-Manningtree, Oxenholme, Penrith & Carlisle all have similarly awkward neutral sections from memory.
It looks like I was getting concerned unnecessarily. Thanks. 1 mile is more than enough.
 

Mrwerdna1

Member
Joined
18 Jul 2018
Messages
148
Location
The Continent
Gosh, finally some fantastic news! This is an excellent approach. Won't guarantee electrification reaches Angus, nor that it does so more quickly, but it certainly helps in that regard. And if wires do reach Montrose at some point it is not as hard to make the argument for bringing them all the way to Aberdeen..

Excellent stuff!
 

stuving

Member
Joined
26 Jan 2017
Messages
722
A few points from the proposal:
  • The grid at Dundee is partly 275 kV and partly 132 kV, with the transformers at Tealing north of the city.
  • The applicant is Scottish Hydro Electric Transmission plc, operating and known as Scottish and Southern Electricity Networks Transmission ("SSEN Transmission").
  • Part of the Stannergate site will be a new 132 kV grid supply point to replace the existing one at Dudhope.
  • Network rail have asked for 16.2 MW.
  • There will be a "25 kV underground cable connection between application site and the Network Rail Feeder Station to be located near to Dundee Railway Station".
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
Quite a size for a feeder station but looks like its all indoor switchgear at 132kV as the grid is cabled in this area.

How many feeder stations are now in play without any timeline for when there will be wiring to feed though. Yes they are essential but personally I would have used the funds to keep the wiring teams occupied as work will dry up shortly once East Kilbride is complete.
From a wiring point of view, East Kilbride is complete although it will probably need some adjustments after testing.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
Any ideas what level and type of traffic this would service? My gut feeling is this is a bit light.
That could easily handle ~ 40 coaches of high performance EMU at full power (i.e. acclerating hard not just maintining speed).
It sound low compared to elsewhere where feeds have typically have been ~80MW from 400kV but how much actual traffic drawing lots of power at the same time will there be?

The key question is how big is the supply area?
There looks to be good easy supply opportunities from 275kV around Perth (intersecting or close to the three routes around the outskirts) and along the Laurencekirk - Stonehaven section hence it may only be feeding the track inside the area bounded by something like the Grange - Cupar - Arbroath.
(Was there any clear plan on the Northern most extent of the Fife electrification feeding?)
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
I think all the feeders stations for new 25kV lines have been from the supergrid over the last few decades, so this may be the first off a 132kV line in quite some time.
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
I realise that trains don’t pull full current all the time and the rating of the supply point depends upon diversity factor. How is this worked out and could this particular area supply a couple of class 99s and a 80x at the same time?
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,596
Location
South Staffordshire
Am I missing something ?
I noted this in the report

These will deliver power to the newly electrified lines between Dundee to Montrose.

When was Dundee to Montrose electrified ?
 