My usual commute from Thurston to Cambridge usually passes off without any drama or incident, as the GA 170's go from A-B without too much effort.

Now the trains are fine, but recently it seems the signalling between Cambridge and Chippenham Junction (between Newmarket/Kennett) seems to be going awfully squiffy on a increasingly regular occurance.

A quick scan on Twitter + personal experience highlights signalling issues at Dullingham:
This afternoon, 5th July, 4th July, 1st July, 25th June, 8th June, 3rd June etc. (sometimes affecting just a few trains, sometimes continuing for a few hours)

Personal experience means it causes the train sometimes to stop at Dullingham (when not booked) and going awfully slowly until near Kennett. Thankfully I haven't been on a train diverted to Ely instead of Cambridge yet...

Is this a repetition of a same fault, or is there more to it than that? Just baffles me slightly (and I'm the first to admit I'm no S&T techie) something has been going wrong on such a regular basis.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,830
Location
East Anglia
Absolutely nothing to do with 'recent occurrence'. This section of signalling has been a pain for years & years. Even when working at Crown Pt back in the mid 90s I used to ask why the Control log always shew signalling probs Dullingham to Cambridge. Still the same today only it occurs on a very slightly less frequency even though the train service & usage has gone from strength to strength.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,668
Two regular problems at Dullingham:

1) the gate locks on the LC not engaging - usually in hot weather

2) the single line control being 'lost' between Dulligham and Chippenham Jn, with modified working implemented. If you were slow bwetween these two places then that was the problem.
 

Sleepy

Established Member
Joined
15 Feb 2009
Messages
1,831
Location
East Anglia
:cry: Sounds as good as Norwich - Ely with crossing staff replaced by obstacle detectors that fail several times a week ! GA must be coining it in from Notwork Rail ??
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Perhaps an improvement as far as operating costs are concerned, but I doubt the TOCs and their passengers see it in quite the same light.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Apprently it is more reliable except for the crossings.
I don't think there were many reliability problems in the days of mechanical signalling! Even if there were, the seemingly continual OD problems must have offset those many times over.
 