And the HST MTUs are now into their third full overhaul cycle (i.e. beyond the second QL4). They were only expected to do two cycles.
That's interesting. Does that imply the MTU engines are coming towards the end of their life or just that they have been used longer that was originally anticipated when the repower was planned.
Would a third repower then be on the cards if the MTU engines are getting to the point they can no longer be rebuild another time?
thanks