With several twitter threads of people complaining about intercity trains being full to overflowing especially with the Edinburgh Festival being on Twitter, I've wondered if it would be possible to join 2 or more long intercity trains together and run them as a single train using only one path?
Could join them a short distance outside the mainline terminal. Some of the through platforms at Edinburgh are probably long enough for a double length train, however would site on the crossover in the between the platforms, unless they were to be separated.
Intermediate stations could be an issue, however could run some direct services if there's enough demand. Alternatively only having half the train stop at intermediate stations, however it would be overlapping other routes/points outside the station.
There's probably also an issue of power. Could the overhead cables and nearby power stations cope with the extra train load in such a short space?
Could join them a short distance outside the mainline terminal. Some of the through platforms at Edinburgh are probably long enough for a double length train, however would site on the crossover in the between the platforms, unless they were to be separated.
Intermediate stations could be an issue, however could run some direct services if there's enough demand. Alternatively only having half the train stop at intermediate stations, however it would be overlapping other routes/points outside the station.
There's probably also an issue of power. Could the overhead cables and nearby power stations cope with the extra train load in such a short space?