JB25
Member
- Joined
- 12 Jan 2013
- Messages
- 355
Hello all,
My my it has been quite a while since I last posted on here. I have been a train driver for almost 8 years now, and I have signed Dorking for 6 years almost but one thing that has always bugged me, and I can't seem to get an answer from anyone, not even a chap I know who has been on the railway for over 40 years and is a bit of an enthusiast.
Basically at Dorking the Signals in the down direction go from CBK 1 - 7, and in the Up from CBK 38 - 41, you then have two shunt signals CBK 27 (in the siding), and CBK 35 to shunt from the country and into the station / siding.
Basically what I want to know is, what ever happened to CBK 8 - 26, 28 - 34 and 36 - 37?
I'm sure such signals must have existed at some point?
Thanks, Jim.
My my it has been quite a while since I last posted on here. I have been a train driver for almost 8 years now, and I have signed Dorking for 6 years almost but one thing that has always bugged me, and I can't seem to get an answer from anyone, not even a chap I know who has been on the railway for over 40 years and is a bit of an enthusiast.
Basically at Dorking the Signals in the down direction go from CBK 1 - 7, and in the Up from CBK 38 - 41, you then have two shunt signals CBK 27 (in the siding), and CBK 35 to shunt from the country and into the station / siding.
Basically what I want to know is, what ever happened to CBK 8 - 26, 28 - 34 and 36 - 37?
I'm sure such signals must have existed at some point?
Thanks, Jim.