Travelling through to Stratford today on the Greater Anglia line, due to engineering works the trains being used were class 379.
As we were approaching Lea Bridge southbound, the driver stated that "due to a fault with the doors it may take 1 to 2 minutes for the doors to open".
Coming home northbound later in the day the driver stated "the doors may take 1 to 2 minutes to open at Lea Bridge as I have to use a different procedure".
I was just interested as to why the doors took longer to open there, a new station, than any others that was all, does anyone know?
As we were approaching Lea Bridge southbound, the driver stated that "due to a fault with the doors it may take 1 to 2 minutes for the doors to open".
Coming home northbound later in the day the driver stated "the doors may take 1 to 2 minutes to open at Lea Bridge as I have to use a different procedure".
I was just interested as to why the doors took longer to open there, a new station, than any others that was all, does anyone know?