I know SY money couldn’t be spent on a nationally significant project, but as has been said countless times on here.. you can throw all the money in the world at something but when it comes to DSA it doesn’t stick. The catchment area is small and fragmented when in the shadow of much bigger competitors. They’re basing their growth forecasts on stemming leakage to MAN, this is a fundamentally flawed strategy as evidenced when Peel spent 17 years trying to do exactly the same things and failing.And today it still fulfils that role, albeit with larger aircraft.
Good, and hopefully the railways continue to grow that side of the business (including delivering passengers to Humberside!).
Crikey, that's a bit of a detour.
Sure, you could improve rail/road access between Sheffield and Manchester, but that's more of a national project. SY cash shouldn't be spent on that really.
Because the government are unlikely to be able to afford to build a road/rail link tunnel under the Peak District pre-2050, even with tolls, and the resultant lack of connectivity will lead to stronger support for local options for international travel.
I agree that the airport is slightly too large for the realistic demand, I hope they find another operator using the runway and airport estate to subsidise it.
Does Humberside have the population catchment to support a low cost or hybrid airline base, without some (albeit modest) transport improvements?
I doubt it would, they seem to be hell bent on supporting it, despite the inconvenient siting.
I had a look, it does quite clearly display a very closed mentality. That doesn't mean SY has to follow that path.
It's quite close to several motorways, very close to several mainline railways and the terrain is flat.
I know it's in a picturesque area, but it is the closest all weather airfield to the centres of population (unless I've missed one further west).
Fair enough. I don't think there's enough flat land for it anyway, so it could never happen.
Ref Leeds East, it actually isn’t. It’s constrained by the ECML on one end and would struggle to get ILS systems that would be needed as the area is prone to low lying fog. It’s also quite far from the mother network and would need huge investment to connect it up to the A1M/A64.. Plus because LBA is privately owned and undergoing a vast regen scheme the investors are highly unlikely to buy into a close and move proposal!
Humberside without DSA has a catchment of around 2 million that are not in direct competition with EMA and LBA, therefore there is a distinct market to serve. It may be smaller but I know that TUI wanted to move aircraft to HUY when DSA closed but understandably the HUY management weren’t too keen on making the necessary investment knowing that there were calls to reopen DSA before it even closed, seems they were correct to be concerned!
I don’t think you can draw conclusions that the video shows a closed mentality at all. It displays a fundamental understanding of how demand worked then and how it works now is no different, it’s just on a different scale. He was quite correct to question the efficacy of opening an airport at Goole/Thorne Waste in the expectation that people from London and the South East would travel up there to catch their flights. The same principle applies to DSA.