Which way was it slewed and between where and where?
See http://www.2d53.co.uk/colwynbay/A55.htm for images and details of the work undertaken around Colwyn Bay to thread the A55 in.
Which way was it slewed and between where and where?
See http://www.2d53.co.uk/colwynbay/A55.htm for images and details of the work undertaken around Colwyn Bay to thread the A55 in.
There may be areas round the Midlands where they don't tilt, but that won't exclude them from tilting elsewhere, any faults aside.
I believe the line between Stafford and Wolves may be one of the few places where XC can do 125mph on Virgin's territory, as I think that line is 125 non-EPS
There is plenty, 390s are timed at 8 and a Voyager at 8½ between Stafford Trent Valley and Bushbury.
These photographs are very good and show the work very well. I visited the project about this time and was given a tour of the works by the Project Engineer.
The new track work was places on a deep layer of ballast and a carpet of stone beneath this top ballast spread the axle load from the trains down onto a grid pattern of reinforced concrete piles. These piles took the load down to solid ground as the overlying strata was weak.
A very interesting project.
See http://www.2d53.co.uk/colwynbay/A55.htm for images and details of the work undertaken around Colwyn Bay to thread the A55 in.
Thank you very much for sharing that.
I am slightly confused by the Single/Double Track Junction in the picture at:-
http://www.2d53.co.uk/colwynbay/sx3.jpg
That presumably was a temporary feature, but it looks permanent.
There may be areas round the Midlands where they don't tilt, but that won't exclude them from tilting elsewhere, any faults aside.
I believe the line between Stafford and Wolves may be one of the few places where XC can do 125mph on Virgin's territory, as I think that line is 125 non-EPS
Quite temporary. I presume they put in a pair of such junctions to connect both new lines to the existing up line during construction. There certainly wasn't any pointwork kept between Llandudno Junction and the emergemcy ground frame at Llanddulas. Signals in the Colwyn Bay area are automatic too (aiui).
The A55 approaching the Glan Conwy junction sits on a concrete raft on piles because of the soft ground. The piles are at sufficiently close intervals that the raft is of unreinforced concrete.