Having watched a recent recording of a Network Rail presentation about renewal work around Crewe I spotted two disturbing features:
First, there was no mention of the new platform on the Manchester Independent lines.
This, or a re-opened platform 13, would allow Manchester to Cardiff trains to avoid crossing the main line on the level.
Given the increased traffic through Crewe station when HS2 Phase 2a arrives, the extra platform would deliver the required extra capacity.
There is to be a new through platform where platform 13 is, but this will only connect to the Chester line northbound.
This new platform was included in the government's 'High Speed Two: Crewe Hub Consultation Response' dated March 2018.
Have I misread Network Rails plans, or have they quietly abandoned the new platform?
And second, probably as a consequence of the above, when HS2 Phase 2a arrives, Network Rail are reducing hourly capacity for non-HS2 passenger trains on the Crewe to Manchester line from 4 trains to 3.
This despite the ministerial assurance obtained during the passage of the Phase 2a bill through parliament that existing capacity would be maintained.
Are Network Rail able to ignore government commitments, or is it the government's sneaky tool for backtracking with minimum accountability?
First, there was no mention of the new platform on the Manchester Independent lines.
This, or a re-opened platform 13, would allow Manchester to Cardiff trains to avoid crossing the main line on the level.
Given the increased traffic through Crewe station when HS2 Phase 2a arrives, the extra platform would deliver the required extra capacity.
There is to be a new through platform where platform 13 is, but this will only connect to the Chester line northbound.
This new platform was included in the government's 'High Speed Two: Crewe Hub Consultation Response' dated March 2018.
Have I misread Network Rails plans, or have they quietly abandoned the new platform?
And second, probably as a consequence of the above, when HS2 Phase 2a arrives, Network Rail are reducing hourly capacity for non-HS2 passenger trains on the Crewe to Manchester line from 4 trains to 3.
This despite the ministerial assurance obtained during the passage of the Phase 2a bill through parliament that existing capacity would be maintained.
Are Network Rail able to ignore government commitments, or is it the government's sneaky tool for backtracking with minimum accountability?