One thing to bear in mind is precisely which variables you are optimising for. Once upon a time you optimised for material usage as that was where the cost of building lay. Labour was cheap. Nowadays there is much more focus on optimising for speed and minimising labour as they are much more dominant components of the overall cost of construction. If your design is chunkier but can be lifted into place in one go in one night then maybe that’s not such an irrational response?

The railway also has exceptionally low tolerance for risk and a desire to future proof which only promotes more robust conservative designs.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,565
Location
Preston Lancs
This doesn't make sense - you surely have to balance the cost of building 1000s of masts strong enough to withstand the impact of a derailed train, with the cost of replacing one slimmer mast, in the very rare event of a train derailing.

Additionally, it is surely much preferable that an electrification mast distorts on impact, than the train body.
That’s what I was thinking and I am glad you said it first.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,470
Location
Somerset
S

do they get the extreme swings we get though?
Over the course of time, yes, though I suspect the tendency to experience all four seasons before lunchtime drops as the climate becomes more continental. In terms of vertical structures, I suspect the toughest feature of our climate is wind - but even there, the difference is probably how often it is very windy rather than the severity of the occasional “extremely windy”
 

DazT

Member
Joined
24 May 2026
Messages
6
Location
Coventry
I understand that the design on the WCML that tried to address the apparent over engineering was not a success. The signal heads could be lowered to the ground to avoid working at height. I don't think they were ever installed anywhere else but happy to be corrected.

Any at height signals need a walkway that is strong enough to carry the weight of the equipment, the staff up there and what ever heavy tools you need so I think there's much choice!
Raised not lowered, crown post signals, but still require working at height, just that the signal head can be wound up out of position so it's easier to work on.


On my patch, we have a load on the Tring workstation area, some around Hanslope and north of Polesworth (IIRC all the way to Armitage [former site of])
 

osmarks

Member
Joined
23 Dec 2024
Messages
18
Location
England
Perhaps the question could be: are external physical systems necessary when we could put it all in the cab and/or automate it? Removes the maintenance liability and initial infrastructure cost; existing systems elsewhere in the world (thinking very high speed rail) probably already do this. (Note I am not advocating for one or the other.)
The standard for in-cab signalling here is ETCS, which is being installed on the south ECML, but it's proving absurdly expensive for unclear reasons.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,045
Location
Surrey
Additionally, it is surely much preferable that an electrification mast distorts on impact, than the train body.
At Hatfield the OLE mast in the main path of the derailed train gave way and did significant damage to one of the coaches. So when you look at the scale of GWR OLE masts and the signal gantry structure above they will present a very hard structure should a derailed vehicle hit them unless the mast bolts are designed to shear if subjected to high lateral force.

Clearly the engineers also have to have structures that arent vulnerable to failure as that would be equally catastrophic so a balance has to be struck.
 

RUK

Member
Joined
5 Aug 2009
Messages
489
Location
East of England
This doesn't make sense - you surely have to balance the cost of building 1000s of masts strong enough to withstand the impact of a derailed train, with the cost of replacing one slimmer mast, in the very rare event of a train derailing.

Additionally, it is surely much preferable that an electrification mast distorts on impact, than the train body.
I was thinking if the wires could come down and electrocute people.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,867
Location
Beeston (Notts)
In the case of the ECML masts, the slimmest of them (152x152 Universal Columns) have been more prone to Lateral Torsional Buckling than its thicker cousins (e.g. 203UC, 254UC, 308x305UC etc) so aren't available in newer design ranges.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,210
Location
Wilmslow
I've noticed the same with regard to the electrification of the Welsh valleys: the masts supporting the wires are overbearing and very unattractive. Perhaps unsightly structures are cheaper to erect than elegant ones.

And don't get me started on the ugly footbridges that are appearing across the network... :)
I went through Abergavenny recently, and was astonished by the absolutely enormous footbridge / lifts recently erected there. It might be appropriate for somewhere like Cardiff Central but is totally over-engineered for what was an attractive country station - it is completely overpowering and dominates the scene. (I know there was an unfortunate incident with the old bridge where someone got electrocuted due to a loose cable slung along it, but even so).
 

Lucan

Established Member
Joined
21 Feb 2018
Messages
1,262
Location
Wales
As a structural engineer, I can tell you at a glance and without doing any calculations that the Tulse Hill gantry and the OHL supports here in South Wales are ridiculously over-engineered.
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,077
As a structural engineer, I can tell you at a glance and without doing any calculations that the Tulse Hill gantry and the OHL supports here in South Wales are ridiculously over-engineered.
Feel free to offer your services and PI cover to Network Rail for slimmer structures.
 

Ashley Hill

Established Member
Joined
8 Dec 2019
Messages
5,680
Location
The West Country
I went through Abergavenny recently, and was astonished by the absolutely enormous footbridge / lifts recently erected there. It might be appropriate for somewhere like Cardiff Central but is totally over-engineered for what was an attractive country station - it is completely overpowering and dominates the scene. (I know there was an unfortunate incident with the old bridge where someone got electrocuted due to a loose cable slung along it, but even so).
Future proofed against any future electrification this century?
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,949
Location
Newport
Other countries seem to be able to build gantries and masts that blend into the scenery and don't fall over.
What do the health and safety laws look like in those other countries and are they doing maintenance from the structure or by using a ladder from the formation?
 

BRX

Established Member
Joined
20 Oct 2008
Messages
4,547
What do the health and safety laws look like in those other countries and are they doing maintenance from the structure or by using a ladder from the formation?
The earlier much slimmer design (as shown in posts 15 and 29) also catered for people on top of it. The need to support a person or two can't explain the amount of structure used on these recent examples.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,949
Location
Newport
The earlier much slimmer design (as shown in posts 15 and 29) also catered for people on top of it. The need to support a person or two can't explain the amount of structure used on these recent examples.
Agreed. It was more the point that direct international comparisons rarely work, such as some other nations OHLE costs not including road bridges etc..

Someday someone will ask why we built enormous expensive structures just to suspend a lightbulb where a driver can see it.
 
Last edited:

sharpener

Member
Joined
4 Oct 2018
Messages
402
The signal gantry is on an "embankment" adjacent to the south circular and the ground conditions are very poor with minimal flexibility in locating the singal for signal spacing reasons. The foundations are two huge steel piles (the largest diameter used for problem OHLE structures).The local ground level is about 4' below the track level and the ground the piles are outside the wing wall.
The is also a singal on the other side of the gantry along with another speed sign (mounted between the gusset and the hidden signal). There is no space here for any ground mounted signals let alone fold down signals and the speed signage.

None of that explains why the main beam has a constant cross-section. This must make it much heavier than necessary, contributing to the need for the massive foundations. I see the same thoughtless over-engineering with motorway signs too, with their vast circular supporting towers - which are not even a good choice of cross-section for an eccentric load.

Here's a slightly earlier (I think) vintage of gantry which appears to be doing much the same job as the one in my OP.

@BRX's example is of a much more elegant tapering structure where the cross-section is appropriate for the loads at every point on the walkway. As we were taught to do in structures design lectures 60 years ago, none of this is new.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,947
Location
Fenny Stratford
Surely this is about simply having standard items that can be bulk manufactured and installed in the same way- that has a cost bonus.

(That is not to say the bulk design cant be "nicer" but if it is a one size fits all then you have to fit all!)

Here's a slightly earlier (I think) vintage of gantry which appears to be doing much the same job as the one in my OP.
i doubt it would meet modern working at height regulations - we cant see how thick the cross beam is for instance
 