Legolash2o
Member
- Joined
- 27 Sep 2018
- Messages
- 687
Hello,
Do routes that are currently have electrification being built still bring W10 improvements?
Context
The reason I ask is that I saw a YouTube video about Gascoigne Wood Interchange having access to key ports and other areas, but there's barely any W10 for those high-cube containers (excluding RT3973s).
https://harworthgroup.com/developments/gascoigne-interchange/
I was wondering if the TRU would bring W10 clearance, leaving a few gaps:


Do routes that are currently have electrification being built still bring W10 improvements?
Context
The reason I ask is that I saw a YouTube video about Gascoigne Wood Interchange having access to key ports and other areas, but there's barely any W10 for those high-cube containers (excluding RT3973s).
I was wondering if the TRU would bring W10 clearance, leaving a few gaps:
- Church Fenton to Sherburn Jn (W9)
- Gascoigne to Micklefield Jn (current W8)
- Micklefield Jn to Leeds (currently W8 but W10 with TRU?)
- Gascoigne to anywhere south west (W8)
- Selby to Hull (W8)


Last edited:
